Enter and Exit of Scissor Lift to Access Top of Cool Room. Safe Work Method Statement (SWMS)

$96.80

The Enter and Exit of Scissor Lift to Access Top of Cool Room. Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Enter and Exit of Scissor Lift to Access Top of Cool Room. Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

When you’re working on a job that involves the use of a scissor lift to access the top of a cool room, safety is paramount. That’s why we’ve developed our Safe Work Method Statement (SWMS) Template specifically for this task. This template is designed to help you stay compliant with Australian Workplace Health and Safety regulations while providing clear guidelines for your team. Here’s a closer look at what makes our SWMS template a valuable tool:

Pre-filled and Comprehensive: Our SWMS template comes pre-filled with relevant details so you can hit the ground running. It covers all necessary aspects to ensure thorough documentation without starting from scratch.

Fully Editable and Customisable: The template is provided in Microsoft Word format, making it simple to edit and customise to suit the specific requirements of your project. Modify any section easily to better reflect your work environment.

Includes the Scope of the Project and the Project Details: Clearly define the scope and critical details of your project. This helps in setting boundaries and understanding the objectives and requirements from start to finish.

Includes Checklist of Any High-Risk Machinery on Site: Identify all high-risk machinery present on-site with our comprehensive checklist. This ensures that every piece of equipment is accounted for and risk-assessed properly.

Includes Space for Recording Any Staff Training: Keep track of any special training your staff has undergone. Documenting training ensures that everyone is adequately prepared and qualified for the tasks assigned.

Includes Before and After Risk Ratings: Evaluate risks before and after implementing control measures. This comparative analysis helps in effectively managing and mitigating hazards.

Includes Resources for Use of Legislative References: Stay compliant by referencing relevant legislative materials. We provide resources to make sure everything aligns with Australian WHS laws.

Includes All PPE Required: Detailed listings of all Personal Protective Equipment needed for the job. Ensuring your team knows what gear they need contributes significantly to their safety.

Includes Risk Assessment and Risk Assessment Matrix: Perform a comprehensive risk assessment with an included matrix to evaluate the level of risk associated with each hazard. This helps in prioritising action plans effectively.

Includes a Checklist to Ensure All Requirements Have Been Covered When Implementing the SWMS: A thorough checklist ensures that no aspect of the Safe Work Method Statement is overlooked during implementation.

Includes Sign Off Page for All Workers and Responsible Persons: Make it official with a sign-off page where all workers and responsible individuals can acknowledge their understanding and commitment to follow the SWMS.

Easy to Use, Easy to Customise: The user-friendly design ensures that even those who aren’t tech-savvy can navigate and customise the template with ease, ensuring full compliance and practicality.

Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Our SWMS template is robust enough to meet the stringent requirements of large contracts and tier 1 tenders, providing the necessary documentation in a streamlined manner.

Quick Delivery by Email: No waiting around—get your SWMS template delivered straight to your inbox right away so you can start working on it immediately.

In summary, our Safe Work Method Statement Template is designed to simplify the process of documenting and implementing safe work practices when using a scissor lift to access the top of a cool room. It’s detailed, customisable, and easy to use, ensuring that your team stays safe and your project remains compliant with Australian workplace health and safety standards.

“`


The Enter and Exit of Scissor Lift to Access Top of Cool Room. Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper PPE
    • inadequate training
  • 2. Pre-Operational Checks
    • Faulty equipment
    • omitted safety inspections
  • 3. Site Assessment
    • Uneven ground
    • overhead obstructions
  • 4. Barricade Setup
    • Inadequate marking
    • trip hazards
  • 5. Scissor Lift Inspection
    • Hydraulic leaks
    • faulty controls
  • 6. Access Area Clearance
    • Debris
    • unauthorised personnel
  • 7. Positioning Scissor Lift
    • Collision with obstacles
    • stability issues
  • 8. Lowering Platform
    • Crush injuries
    • unstable load
  • 9. Enter Scissor Lift
    • Misstep
    • fall from height
  • 10. Secure Harness
    • Improperly fitted harness
    • inadequate anchor points
  • 11. Elevating Platform
    • Tip-over
    • electrical contact
  • 12. Performing Work
    • Falling objects
    • tool misuse
  • 13. Monitoring Environment
    • Wind gusts
    • changing ground conditions
  • 14. Complete Task
    • Fatigue
    • improper tool storage
  • 15. Lower Scissor Lift
    • Rapid descent
    • blocked path
  • 16. Exit Scissor Lift
    • Slip
    • tripping on uneven surface
  • 17. Post-Operational Check
    • Overlooked defects
    • unreported damage
  • 18. Remove Barricades
    • Trip hazards
    • lifting strain
  • 19. Tool and Equipment Storage
    • Incorrect storage
    • blocking pathways
  • 20. Review and Report
    • Missing documentation
    • incomplete reporting

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Enter and Exit of Scissor Lift to Access Top of Cool Room. Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart