Engaging In Overhead Works Safe Work Method Statement (SWMS)

$96.80

The Engaging In Overhead Works Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Engaging In Overhead Works Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Engaging In Overhead Works Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Engaging In Overhead Works Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Engaging In Overhead Works Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Engaging In Overhead Works Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Engaging In Overhead Works Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over tools
    • Falling objects
  • 2. Ladder Setup
    • Falling from heights
    • Incorrect ladder setup
  • 3. Tool Handling
    • Incorrect tool use
    • Electrical shock
  • 4. Communication
    • Ineffective communication
    • Misunderstanding instructions
  • 5. Overhead Work Commencement
    • Striking against objects
    • Fatigue
  • 6. Equipment Operation
    • Improper handling
    • Mechanical failure
  • 7. Breaks
    • Overexertion
    • Dehydration
  • 8. Clean Up
    • Contact with harmful substances
    • Slips and trips
  • 9. Lift Equipment Dismantling
    • Crushing injuries
    • Pinch points
  • 10. Evaluation
    • Negligence of safety measures
    • Inadequate feedback
  • 11. Maintenance
    • Equipment failure
    • Exposure to harmful substances
  • 12. Documentation
    • Missing information
    • Inappropriate record keeping
  • 13. Training
    • Improper technique
    • Lack of knowledge
  • 14. Emergency Response
    • Unprepared for accidents
    • Panic in emergency situations
  • 15. Closeout
    • Incomplete procedures
    • Oversight in safety checks
  • 16. Debrief
    • Information miscommunication
    • Missed learning opportunity
  • 17. Equipment Storage
    • Poor storage practices
    • Physical injuries from improper lifting techniques
  • 18. Follow up
    • Missed follow-up checks
    • Negligence of safety regulations
  • 19. Equipment Inspection
    • Missed faulty equipment
    • Inadequate inspection understanding
  • 20. Compliance Review
    • Lack of adherence to standards
    • Ignorance of updated regulations

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Engaging In Overhead Works Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart