BlueSafe

Elevator Installation Risk Assessment

This risk assessment covers elevator installation activities, including planning, delivery, shaft access, component placement, electrical work and commissioning support.

Activities covered include

  • Plan site reviews, work sequencing and coordination
  • Install, test and energise electrical equipment
  • Support inspection, commissioning and emergency readiness

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Elevator Installation Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers elevator installation activities, including planning, delivery, shaft access, component placement, electrical work and commissioning support. It supports planning and managing hazards from falls, lifting, electrical systems, restricted spaces, tools and shared work areas.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Plan site reviews, work sequencing and coordination
  • Deliver, unload and move elevator materials
  • Access shafts, openings and elevated work areas
  • Lift, rig and position elevator components
  • Work in plant rooms, shafts and restricted spaces
  • Install, test and energise electrical equipment
  • Use tools, plant and temporary equipment
  • Manage dust, hazardous substances and legacy building materials
  • Coordinate with other trades and control public access
  • Support inspection, commissioning and emergency readiness

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out elevator installation activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning, site review and coordination
  • Unidentified shaft, plant room or landing hazards
  • Conflicting trades and uncontrolled access to work areas
  • Incorrect sequencing creating exposure to falls, dropped objects or plant interaction
  • Emergency arrangements not understood by workers
Delivery, unloading and material movement
  • Workers struck by moving vehicles, forklifts or suspended loads
  • Crush injuries during unloading or shifting lift rails, doors, machines and panels
  • Unstable loads or poor stacking causing collapse
  • Manual handling strains from awkward or heavy components
Shaft access, openings and work at height
  • Falls into open shafts or from landing edges
  • Falls from ladders, temporary platforms or elevated work areas
  • Dropped tools or materials striking persons below
  • Unsafe access or egress during installation
Lifting, rigging and placement of elevator components
  • Suspended loads falling or swinging
  • Crush or pinch injuries during positioning of rails, machines, doors or car components
  • Failure of lifting gear or incorrect rigging
  • Workers entering line-of-fire zones during lifts
Plant room, shaft and restricted-space work
  • Restricted movement causing slips, trips and musculoskeletal injury
  • Entrapment or delayed evacuation from shaft or plant room areas
  • Poor ventilation, heat or airborne contaminants in enclosed areas
  • Inadequate communication with workers outside the area
Electrical installation, testing and energisation
  • Electric shock from live parts, damaged leads or incorrect isolation
  • Arc flash or burns during testing or fault finding
  • Unauthorised energisation while workers are in contact with equipment
  • Use of conductive tools or personal items near energised parts
Tools, plant and temporary equipment use
  • Injury from defective power tools, portable equipment or temporary power
  • Noise, vibration and flying particles
  • Entanglement, cuts or contact injuries
  • Trip hazards from leads, hoses and scattered equipment
Hazardous substances, dust and legacy building materials
  • Exposure to dust, fumes, sealants, oils or cleaning chemicals
  • Disturbance of asbestos-containing materials in older buildings
  • Gas cylinder leaks or poor storage where welding or heating is involved
  • Skin or eye contact with hazardous substances
Interaction with other trades and public areas
  • Unauthorised entry into shaft, landing or lifting areas
  • Workers or occupants struck by materials, doors, tools or moving plant
  • Miscommunication during shared access, shutdowns or testing
  • Removal or bypassing of barriers by others
Inspection, commissioning support and emergency readiness
  • Unexpected movement of elevator equipment during testing or adjustment
  • Workers exposed to live systems or moving components during fault rectification
  • Inadequate response to falls, electrical incidents or entrapment
  • Failure to identify defects before handover or further work

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant used to lift or suspend persons or things; p. 17.
  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: How to manage and control asbestos in the workplace — 2.1. What is involved in managing risks?; p. 12.
  • Model guidance: Model Code of Practice: Managing risks of hazardous chemicals in the workplace — 2.2 Safety Data Sheets (SDS); p. 16.
  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 5. Isolation, locking off and access; p. 34.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
  • Model guidance: Model Code of Practice: Managing noise and preventing hearing loss at work — 5. Controlling the risks; p. 29.
  • Model guidance: Model Code of Practice: How to manage work health and safety risks — 5. Step 4 — How to review controls; p. 27.
  • Model guidance: Model Code of Practice: Welding processes — 1.3 What is involved in managing risks associated with welding processes?; p. 10.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Building and ConstructionManufacturing and ProductionElectrical and SolarMining and Resources

Related templates

$79.50

One-time payment