BlueSafe
General Locksmithing Door Hardware and Lock Installation SWMS

General Locksmithing Door Hardware and Lock Installation SWMS

  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content – Ready to Deploy Immediately
  • Customisable – Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

General Locksmithing Door Hardware and Lock Installation SWMS

Product Overview

This General Locksmithing Door Hardware and Lock Installation SWMS is a comprehensive Safe Work Method Statement designed to identify hazards, assess risks, and implement effective controls for locksmithing activities on Australian worksites. It provides detailed guidance across a wide range of lock installation, servicing, and key-cutting tasks to support WHS compliance and safe, efficient locksmith operations.

Activities & Specific Tasks Covered

This document includes specific risk controls for:

  • Safe installation of deadbolts to timber, steel, and composite doors, including drilling, chiselling, and fixing methods
  • Management of risks when dealing with broken keys in locks, including use of extraction tools and avoiding damage to hardware
  • Operation of key cutting machines for standard and speciality keys, including guarding, PPE, and control of metal swarf
  • Procedures for accurate duplication of keys, including verification of key profiles and secure handling of customer keys
  • Laser-cut key duplication, including safe use of electronic key-cutting equipment and electrical safety controls
  • Fitting and aligning new locks to doors, frames, and jambs, including drilling, fixing, and testing of operation
  • Installation of high-security locks, including restricted key systems, cylinders, and associated hardware
  • Installation of pick-resistant and insurance-rated locks, including compliance with manufacturer and insurer requirements
  • Installing cabinet and furniture locks, including small-part handling, tool safety, and protection of finished surfaces
  • Changing and rekeying locks, including removal and replacement of cylinders, pins, and barrels
  • Servicing of pin tumbler locks, including disassembly, cleaning, lubrication, and reassembly
  • Installation and servicing of emergency exit locks and hardware, including panic bars and egress-compliant devices
  • Installation and adjustment of roller door locks, including work at height on ladders and step platforms
  • Real estate and strata rekey services, including handling multiple keys, site access, and security of key sets
  • General mobile locksmith work, including vehicle loading, manual handling of tools and hardware, and on-site customer interaction

Who is this for?

This SWMS is designed for mobile and workshop-based locksmiths, door hardware installers, maintenance contractors, and site supervisors who manage or oversee locksmithing and door security work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning and assessment
  • • Unclear scope of works
  • • Unidentified live services
  • • Unverified emergency exits
  • • Uncoordinated work with other trades
  • • Client time pressure
  • • Inadequate information on door fire rating
  • • Incorrect lock specification
Travel, parking and site access
  • • Vehicle collision
  • • Unplanned vehicle movement
  • • Reversing in shared driveways
  • • Poor lighting in carparks
  • • Manual handling of toolboxes
  • • Slip hazards on wet surfaces
  • • Aggressive persons during emergency callouts
Site induction and work area setup
  • • Uncontrolled pedestrian movement
  • • Trip hazards from tools and leads
  • • Poor housekeeping
  • • Unauthorised access to work area
  • • Noise exposure from key cutting machine
  • • Dust and metal swarf exposure
Manual handling of doors and hardware
  • • Muscular strain from lifting doors
  • • Sudden door movement
  • • Pinch points at hinges
  • • Crush injuries to fingers
  • • Overreaching when working at height
  • • Carrying heavy key machines
Use of hand and power tools
  • • Contact with rotating tools
  • • Flying metal swarf
  • • Electrical shock from faulty leads
  • • Tool kickback during drilling
  • • Lacerations from hand tools
  • • Noise from grinders and cutters
  • • Entanglement in moving parts
Lock removal and door preparation
  • • Sharp edges on old hardware
  • • Lead-based paint disturbance
  • • Exposure to asbestos-containing materials
  • • Damage to fire-rated doors
  • • Hidden electrical or alarm cables
  • • Splinters from timber doors
Installation of new door locks
  • • Misaligned latch or deadbolt
  • • Door not latching securely
  • • Compromised fire or smoke seal
  • • Entrapment due to faulty lock
  • • Sharp chiselling tools
  • • Repetitive use injuries
Key cutting and duplication
  • • Contact with cutting blade
  • • Metal swarf ejection
  • • Noise from key machines
  • • Eye injury from flying chips
  • • Electrical fault in key machine
  • • Incorrect key profile duplication
Dealing with broken or stuck keys
  • • Sudden release of tension
  • • Tool slippage into hand
  • • Damage to lock cylinder
  • • Sharp broken key edges
  • • Working in awkward positions
  • • Forced entry under time pressure
Rekeying and servicing lock cylinders
  • • Loss of small parts
  • • Spring ejection into eyes
  • • Incorrect pinning sequence
  • • Uncontrolled key access
  • • Exposure to cleaning solvents
Emergency exit and egress door work
  • • Compromised emergency egress
  • • Non-compliant hardware selection
  • • Working at heights on stairwells
  • • Working in low-light fire stairs
  • • Uncontrolled door closure
Window, screen door and cabinet locks
  • • Falls from windows
  • • Glass breakage
  • • Sharp aluminium edges
  • • Small parts ingestion risk
  • • Damage to customer property
High-security and insurance-rated systems
  • • Improper installation voiding rating
  • • Uncontrolled restricted keys
  • • Client data and key register loss
  • • Targeted theft of keys and cylinders
  • • Complex multi-door configurations
Job completion, testing and documentation
  • • Incomplete locking systems
  • • Unreported safety non-compliances
  • • Residual debris on floor
  • • Incorrect key allocation
  • • Future lock failure due to poor testing

Need to add specific site requirements?

Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.

Legislation & References

This document was researched and developed to align with:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017
  • Managing the Risk of Plant in the Workplace Code of Practice: Guidance on the safe use of key cutting machines, power tools, and portable equipment
  • Managing the Work Environment and Facilities Code of Practice: Requirements for safe locksmith workshops, mobile work environments, and amenities
  • How to Manage Work Health and Safety Risks Code of Practice: Framework for hazard identification, risk assessment, and control implementation within locksmithing tasks
  • Hazardous Manual Tasks Code of Practice: Controls for lifting doors, door hardware, toolboxes, and repetitive key-cutting tasks
  • AS 4145.1–2008: Locksets and hardware – Padlocks: Reference for performance requirements relating to certain lock and hardware types
  • AS 4145.2–2008: Locksets and hardware – Mechanical locksets for doors: Reference for installation and performance of mechanical door locksets
  • AS 1905.1–2015: Components for the protection of openings in fire-resistant walls – Fire-resistant doorsets: Relevant where locksmithing involves fire doors and emergency exit hardware

Standard SWMS Features (Click to Expand)
  • Operational guidelines, with a step-by-step approach to safe work
  • Possible hazards that may be encountered
  • Step-by-step safety procedures to follow
  • Before work starts – Guidelines and Checks
  • Safety measures and guides
  • Operational Safety Checks
  • Before and After Risk Ratings
  • Risk Assessment Matrix
  • High Risk Work Involved
  • Emergency Evacuation Procedure
  • Plant and Equipment
  • Qualifications and Permits
  • Specific Personal Protective Equipment (PPE)
  • Company Personnel Sign-off form

$96.8

Safe Work Australia Aligned