BlueSafe
Landscape Construction and Hardscaping SWMS

Landscape Construction and Hardscaping SWMS

  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content – Ready to Deploy Immediately
  • Customisable – Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Landscape Construction and Hardscaping SWMS

Product Overview

This Landscape Construction and Hardscaping SWMS is a site-ready Safe Work Method Statement designed to identify hazards, assess risks, and implement effective controls for landscaping and hardscape installation works. It is a comprehensive document covering multiple aspects of landscape construction and hardscaping activities to support robust WHS compliance on Australian worksites.

Activities & Specific Tasks Covered

This document includes specific risk controls for:

  • Application of geotextiles and geofabric, including manual handling, cutting, fixing, and trench work
  • Safe installation and removal of artificial turf, including subgrade preparation and adhesive use
  • Cleaning patios and decks using pressure cleaners, chemicals, and manual tools while managing slips and trip hazards
  • Conditioning soil with rock pickers and similar equipment, including guarding, exclusion zones, and noise controls
  • Construction of water features and ponds, including excavation, waterproofing, electrical interface, and fall-into-water risks
  • Creation of new landscape features such as garden beds, edging, and retaining elements with appropriate structural and stability controls
  • Landscape drainage works, including trenching, pipe laying, backfilling, and working around underground services
  • Drainage works near trees, including root management, tree protection, and plant and equipment exclusion zones
  • Routine and corrective fountain maintenance, including isolation of pumps, electrical safety, and working near water
  • Garden renovation activities involving demolition, including removal of old structures, concrete, and hard surfaces with dust and debris control
  • Installation and removal of goal posts and similar landscape fixtures, including lifting techniques and use of mechanical aids
  • Installing garden steps or stairs, including excavation, formwork, compaction, and slip/trip prevention
  • Installing outdoor kitchens or barbecues, including lifting and positioning, gas and electrical coordination, and fire risk management
  • Installing shade structures, pergolas, and similar overhead features, including work at height and structural stability controls
  • General hardscaping tasks such as paving, concreting, and compacting surfaces to minimise manual handling and plant interaction risks

Who is this for?

This SWMS is designed for landscapers, landscape construction contractors, civil and grounds maintenance crews, hardscaping specialists, and site supervisors overseeing outdoor construction and renovation works.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning and consultation
  • • Unidentified underground services
  • • Uncontrolled public access
  • • Conflicting work activities
  • • Inadequate emergency planning
  • • Extreme weather exposure
Site establishment and traffic management
  • • Unplanned vehicle movement
  • • Mobile plant and pedestrian interaction
  • • Uneven ground surfaces
  • • Manual handling of temporary fencing
  • • Noise exposure
Existing structures and garden demolition
  • • Uncontrolled structural collapse
  • • Flying debris from demolition
  • • Silica dust from masonry
  • • Hidden sharp objects
  • • Noise and vibration
Excavation and landscape drainage works
  • • Excavation collapse
  • • Contact with underground services
  • • Mobile plant roll-over
  • • Falling into trenches or ponds
  • • Water ingress and flooding
Soil conditioning and rock handling
  • • Entanglement in rock picker
  • • Struck by moving rocks
  • • Musculoskeletal strain
  • • Dust inhalation
  • • Plant noise and vibration
Structural landscaping and stone masonry
  • • Structural failure of retaining walls
  • • Falling from height on steps
  • • Stone cutting silica dust
  • • Pinch points with stone blocks
  • • Cement and mortar burns
Drainage works and irrigation near trees
  • • Tree root damage
  • • Undermining tree stability
  • • Tripping over open trenches
  • • Contact with pressurised water
  • • Exposure to contaminated runoff
Geotextile and synthetic surfacing installation
  • • Trip hazards from loose fabric
  • • Knife and cutting injuries
  • • Heat exposure from synthetic surfaces
  • • Inhalation of adhesive fumes
  • • Musculoskeletal strain from kneeling
Installing turf, plants and landscape features
  • • Manual handling of rolls and plants
  • • Puncture injuries from stakes
  • • Allergic reactions to plants
  • • UV radiation exposure
  • • Contact with fertilisers and pesticides
Water features, ponds and fountains
  • • Drowning in ponds
  • • Electrical shock near water
  • • Slips on wet surfaces
  • • Biological contamination
  • • Confined space-like conditions
Outdoor kitchens, barbecues and shade structures
  • • Gas leaks and fire
  • • Structural collapse of shade
  • • Falling from height
  • • Crush injuries from posts
  • • Contact with hot surfaces
Goal posts, netting and sports features
  • • Goal post tip-over
  • • Falling objects during erection
  • • Entanglement in netting
  • • Struck by moving equipment
  • • Working at low heights
Patio, decking and hard surface works
  • • Slips and trips on wet surfaces
  • • Exposure to cleaning chemicals
  • • Noise from pressure washers
  • • Flying particles from grinding
  • • Electric shock from tools
Final clean up, inspection and handover
  • • Residual trip hazards
  • • Unsecured fixtures and fittings
  • • Leftover chemicals and waste
  • • Sharp construction debris
  • • Unauthorised public access

Need to add specific site requirements?

Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.

Legislation & References

This document was researched and developed to align with:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017
  • Code of Practice: Construction Work – managing risks associated with general construction and landscape construction activities
  • Code of Practice: Managing the Risk of Falls at Workplaces – controls for working on steps, stairs, elevated platforms, and around excavations
  • Code of Practice: Excavation Work – requirements for trenches and excavations used for drainage, foundations, and landscape features
  • Code of Practice: Managing Noise and Preventing Hearing Loss at Work – guidance for powered equipment such as rock pickers, compactors, and pressure cleaners
  • Code of Practice: Hazardous Manual Tasks – controls for lifting, carrying, and handling pavers, turf rolls, goal posts, and structural elements
  • Code of Practice: Managing Risks of Hazardous Chemicals – safe use of cleaning agents, sealants, adhesives, and treatment products
  • AS/NZS 3500 Plumbing and Drainage – relevant guidance for landscape drainage connections and water feature plumbing interfaces
  • AS 2156.1 Walking Tracks – Classification and signage – as guidance where landscape paths, steps, and access ways are provided for public use

Standard SWMS Features (Click to Expand)
  • Operational guidelines, with a step-by-step approach to safe work
  • Possible hazards that may be encountered
  • Step-by-step safety procedures to follow
  • Before work starts – Guidelines and Checks
  • Safety measures and guides
  • Operational Safety Checks
  • Before and After Risk Ratings
  • Risk Assessment Matrix
  • High Risk Work Involved
  • Emergency Evacuation Procedure
  • Plant and Equipment
  • Qualifications and Permits
  • Specific Personal Protective Equipment (PPE)
  • Company Personnel Sign-off form

$96.8

Safe Work Australia Aligned