DJI Agras T 40 Spray Drone Chemical Application Safe Work Method Statement (SWMS)

$96.80

The DJI Agras T 40 Spray Drone Chemical Application Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the DJI Agras T 40 Spray Drone Chemical Application Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

If you’re working with the DJI Agras T 40 Spray Drone for chemical application, you’ll know that having a proper Safe Work Method Statement (SWMS) is essential. Our SWMS Template is designed to assist you in creating a thorough and compliant document, so your team can operate safely and efficiently. Here’s what you can expect from our template:

Key Features:

  • Pre-filled and Comprehensive: Save time and effort with a pre-filled SWMS template that covers all essential aspects. This gives you a solid starting point to ensure no detail is overlooked.
  • Fully editable and customisable in Microsoft Word format for easy editing: Our template is provided in a Microsoft Word format, making it simple to edit and tailor to your specific needs. Change any section to suit your project requirements effortlessly.
  • Includes the scope of the project and the project details: Define the exact scope and parameters of your project clearly. This includes detailing what will be done, where, when, and by whom.
  • Includes checklist of any high-risk machinery on site: Identify and list all high-risk machinery involved in the project. This ensures awareness and preparedness among all staff members and helps in mitigating any potential hazards.
  • Includes space for recording any staff training: Keep track of all required and completed training for your staff. Ensuring everyone is adequately trained is crucial for maintaining safety standards.
  • Includes before and after risk ratings: Evaluate the risks before and after control measures are implemented. This helps in understanding the effectiveness of your risk management strategies.
  • Includes resources for use of legislative references: Access legislative references directly within the template. Stay compliant with current laws and regulations without needing to search elsewhere.
  • Includes all PPE required: Detail all Personal Protective Equipment necessary for the job. Ensuring workers have and use the correct PPE is a vital part of workplace safety.
  • Includes risk assessment and risk assessment matrix: Conduct thorough risk assessments using the included matrix. This structured approach simplifies the identification and prioritisation of risks, making them easier to manage.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: Use this checklist to make sure nothing has been missed out when implementing your SWMS, promoting comprehensive safety coverage.
  • Includes sign off page for all workers and responsible persons: Ensure accountability with a sign-off page where all workers and responsible persons can acknowledge their understanding and commitment to the SWMS.
  • Easy to use, easy to customise: The template is user-friendly and straightforward, designed to make customisation quick and hassle-free, allowing you to focus on other important tasks.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Whether you’re working on small projects or major contracts, our SWMS template meets the requirements for various scales of work, including tier 1 contracts.
  • Quick delivery by email: Once purchased, the template will be delivered to your inbox promptly so you can get started right away without waiting.

We aim to provide a valuable tool that assists you in enhancing workplace safety and compliance. With our DJI Agras T 40 Spray Drone Chemical Application SWMS Template, prepare yourself with a resource that supports your commitment to a safer work environment.

“`


The DJI Agras T 40 Spray Drone Chemical Application Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Manual handling of drone
    • Slipping on wet surface
  • 2. Site Assessment
    • Uneven terrain
    • Presence of wildlife
  • 3. Drone Assembly
    • Sharp edges
    • Misconnection of parts
  • 4. Battery Installation
    • Electrical shock
    • Incorrect installation
  • 5. Chemical Mixing
    • Spillage
    • Inhalation of fumes
  • 6. Filling the Tank
    • Chemical splash
    • Overfilling
  • 7. Pre-Flight Check
    • Equipment malfunction
    • Missing checks
  • 8. Flight Planning
    • Inaccurate GPS data
    • Collision risks
  • 9. Take-Off
    • Loss of control
    • Propeller injury
  • 10. In-Flight Operation
    • Low battery
    • Weather conditions
  • 11. Application of Chemicals
    • Drift hazards
    • Exposure to chemicals
  • 12. Mid-Flight Adjustments
    • Distractions
    • Communication failure
  • 13. Emergency Procedures
    • System failure
    • Rapid descent
  • 14. Landing
    • Hard landing
    • Ground obstacles
  • 15. Post-Flight Inspection
    • Wear and tear assessment
    • Data logging
  • 16. Battery Removal
    • Electrical shock
    • Hot components
  • 17. Chemical Disposal
    • Environmental contamination
    • Contact with skin
  • 18. Cleaning Equipment
    • Chemical residues
    • Use of cleaning agents
  • 19. Storage of Drone
    • Fire hazard
    • Inadequate space
  • 20. Record Keeping
    • Incorrect records
    • Data loss

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The DJI Agras T 40 Spray Drone Chemical Application Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart