Deep Foundation Pit Excavation Safe Work Method Statement (SWMS)

$96.80

The Deep Foundation Pit Excavation Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Deep Foundation Pit Excavation Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Deep Foundation Pit Excavation Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Deep Foundation Pit Excavation Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Deep Foundation Pit Excavation Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Deep Foundation Pit Excavation Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Deep Foundation Pit Excavation Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Site Preparation
    • Trip and fall
    • Hit by moving vehicles
    • Unstable materials collapse
  • 2. Site Clearance
    • Hit by moving vehicles
    • Noise pollution
    • Dust
    • asbestos and silica exposure
  • 3. Utility Identification
    • Electric shock
    • Gas leaks
    • Water pollution
  • 4. Ground Surveying
    • Slip
    • trip and fall hazards
    • Inadequate survey data
  • 5. Machine Placement
    • Machine overturn
    • Proximity to excavations or buildings
    • inadequate ground conditions
  • 6. Excavation
    • Ground instability and collapse
    • Struck by flying debris
    • Noise and vibration
  • 7. Soil Removal
    • Dust and silica exposure
    • Manual handling injuries
    • Hit by moving vehicles
  • 8. Shoring installation
    • Manual handling injuries,Collapse of shoring,Working at heights
  • 9. Depth Measurement
    • Confined space hazards
    • Fall from height
  • 10. Foundation Laying
    • Collapse of pit
    • Manual handling injuries
    • Working at height
    • Labelling or communications errors
  • 11. Concreting
    • Skin irritation
    • Eye damage
    • Chemical burns due to cement
  • 12. Construction of Walls
    • Falls from height
    • Collapse of structure
    • Noise pollution
  • 13. Dewatering
    • Water pollution
    • Slip and trip hazards
    • Electric shocks
  • 14. Backfilling
    • Struck by equipment
    • Dust generation
    • Collapse of edge protection
  • 15. Site Restoration
    • Disturbance to local ecology
    • Trip and fall hazards
    • Residual chemicals in soil

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Deep Foundation Pit Excavation Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart