Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement (SWMS)

$96.80

The Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Dangers From Gas Pipes Or Flammable Sources Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect handling of gas pipes
    • Failure to use appropriate personal protective equipment (PPE)
  • 2. Identification of Flammable Sources
    • Inadequate identification or marking of sources
    • Ingestion or inhalation of flammable substances
  • 3. Safeguard Measures
    • Absence of fire extinguishers
    • Uncontained flammable materials
  • 4. Handling Gas Pipes
    • Improper maintenance of pipes
    • Ignition of leaking gas
  • 5. Transporting Materials
    • Spillage and leakage
    • Exposure to flammable substances
  • 6. Use of Machinery near Flammable Sources
    • Ignition hazards from machinery
    • Mechanical injuries
  • 7. Waste Disposal
    • Improper disposal causing risk of fire
    • Escaped flammable materials causing hazard
  • 8. Maintenance of Equipment
    • Incorrect maintenance methodology
    • Contact with hazardous substances
  • 9. Emergency Procedures
    • Inadequate training for emergency
    • Poor accessibility to escape routes
  • 10. Site Clean-up
    • Moisture in gas lines
    • Dust accumulation
  • 11. Inspection of Work site
    • Poor visibility
    • Misjudgment of distance
  • 12. Storage of flammable substances
    • Improper storage conditions
    • Excessive storage quantities
  • 13. Monitor atmospheric conditions
    • Potential ignition sources
    • Accidental release of gas
  • 14. Personal Hygiene
    • Respiratory or skin exposure to harmful substances
    • Fatigue leading to mistakes
  • 15. Site Decommission
    • Accidental pipe damage
    • Leaving of hazardous residue
  • 16. Post Work Review and Reporting
    • Inadequate monitoring and reporting
    • Ignorance towards identified risks
  • 17. Equipment Dismantling and Transport
    • Potential for gas leaks
    • Spillage during transport
  • 18. Public Safety Measures
    • Inadequate public warnings or barriers
    • Unmanaged crowd near flammable areas
  • 19. Communication and Training
    • Inadequate communication and understanding between workers
    • Insufficient training provided to operators
  • 20. Regular Auditing
    • Inadequate documentation of process changes
    • Irregular auditing schedule

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Dangers From Gas Pipes Or Flammable Sources Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart