Construction Site Recoveries Safe Work Method Statement (SWMS)

$96.80

The Construction Site Recoveries Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Construction Site Recoveries Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Construction Site Recoveries Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Construction Site Recoveries Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Construction Site Recoveries Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Construction Site Recoveries Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Construction Site Recoveries Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Illness from poor hygiene
    • Cut and bruises from sharp objects
  • 2. Site Inspection
    • Risk of falling from height
    • Inhalation of dust
    • Exposure to noise
  • 3. Equipment Setup
    • Electric shock
    • Crushing injuries from heavy equipment
    • Fire from power tools
  • 4. Ground Work
    • Mudslides
    • Tripping over unseen objects
  • 5. Excavation
    • Cave-ins or collapses
    • Fall into excavation
  • 6. Material Handling
    • Strains and injuries from lifting
    • Falling objects
  • 7. Masonry Construction
    • Falling from height
    • Dust inhalation
    • Slips and falls on debris
  • 8. Framework Assembly
    • Pinch points from pneumatic devices
    • Fall from scaffold
    • Hand injury
  • 9. Structural Steelwork
    • Falls from heights
    • Crushed by steel beams
    • Eye injury from welding flash
  • 10. Roofing Installation
    • Fall from roof
    • Electric shock from power lines
  • 11. Interior Installation
    • Noise exposure
    • Cuts from sharp tools
    • Eye injury from flying debris
  • 12. Window Fitting
    • Glass injuries
    • Fall from height
  • 13. Painting and Decorating
    • Inhalation of toxic fumes
    • Skin irritation from paint
  • 14. Plumbing Installation
    • Chemical exposure
    • Infection from unsanitary conditions
  • 15. Electrical Installation
    • Electric shock
    • Burns from hot elements
  • 16. Clean Up
    • Trips and falls on debris
    • Cut and puncture injuries from sharp objects
  • 17. Waste Disposal
    • Chemical exposure
    • Wire accidents or fire from spontaneous heating
  • 18. Debriefing and Documentation
    • Inadequate training for documentation proceeding
    • Information miscommunication
  • 19. Equipment Pack Down
    • Strains and injuries from lifting
    • Crushing injuries from heavy equipment
  • 20. Site Closure
    • Unauthorized access to site
    • Leftover waste or debris causing harm

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Construction Site Recoveries Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart