BlueSafe

Concrete Mixer SWMS

This SWMS covers planning, setting up, operating and cleaning concrete mixers, including receiving and discharging concrete.

Activities covered include

  • Plan the work and brief the crew
  • Discharge concrete from portable and transit mixers
  • Clean up and demobilise the work area

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Concrete Mixer SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning, setting up, operating and cleaning concrete mixers, including receiving and discharging concrete. It supports work planning and risk management for vehicle movement, dust, wet concrete, moving parts, electrical hazards and cleanup.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work and brief the crew
  • Set up and control the work area
  • Receive and manage transit mixer movements
  • Set up, inspect and operate portable mixers
  • Load dry materials and mix concrete batches
  • Discharge concrete from portable and transit mixers
  • Place and finish concrete
  • Wash out mixers and equipment
  • Isolate faults, blockages and unexpected start-up risks
  • Clean up and demobilise the work area

Who is this for?

Suitable for contractors, workers, supervisors and businesses undertaking concrete mixing, concrete placement and associated cleanup activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan work and brief crew
  • Unplanned plant interaction
  • Incorrect mix materials
  • Silica dust exposure
  • Wet concrete burns
  • Untrained operation
  • Production pressure
Establish work area
  • Pedestrian strike
  • Plant collision
  • Slips and trips
  • Unauthorised entry
  • Overhead powerline contact
  • Poor ground stability
Receive transit mixer
  • Reversing vehicle strike
  • Vehicle roll-away
  • Blind spots
  • Concrete chute strike
  • Public vehicle interaction
  • Driver fatigue
Set up portable mixer
  • Mixer overturn
  • Electrical shock
  • Moving plant contact
  • Trailing leads
  • Manual handling strain
  • Fuel ignition
Inspect mixer and controls
  • Entanglement in drive
  • Guard failure
  • Electric shock
  • Hydraulic leak
  • Unexpected start-up
  • Noise exposure
Load dry materials
  • Respirable silica dust
  • Cement dust inhalation
  • Manual handling strain
  • Bag rupture
  • Eye contamination
  • Slips from spillage
Mix concrete batches
  • Entanglement in drum
  • Crush at tilt mechanism
  • Wet concrete splash
  • Excessive noise
  • Mixer overload
  • Unplanned start-up
Discharge portable mixer
  • Concrete splash
  • Crush at discharge mechanism
  • Barrow overturn
  • Wet concrete burns
  • Slips on slurry
  • Manual handling strain
Discharge transit mixer
  • Chute crush
  • Concrete splash
  • Vehicle movement
  • Drum entanglement
  • Overhead contact
  • Wet concrete burns
Place and finish concrete
  • Concrete splash
  • Manual handling strain
  • Slips on wet surface
  • Hand-tool cuts
  • Silica dust from dry finishing
  • Heat stress
Wash out equipment
  • Alkaline wash water
  • Concrete splash
  • Environmental contamination
  • Entanglement during cleaning
  • Slips on slurry
  • Pressure hose injury
Isolate faults and blockages
  • Unexpected start-up
  • Stored energy release
  • Entanglement
  • Electric shock
  • Hydraulic injection
  • Falling components
Clean up and demobilise
  • Residual slurry slips
  • Manual handling strain
  • Plant strike
  • Dust during cleanup
  • Environmental release
  • Unauthorised plant use

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: How to manage work health and safety risks (guidance only; adopt only where approved or otherwise applicable in the relevant jurisdiction).
  • Model Code of Practice: Managing the risks of plant in the workplace (guidance only; includes plant, guarding, electrical-line and hierarchy-of-control guidance).
  • Model Code of Practice: Construction work (guidance only; use where concrete mixing forms part of construction work).
  • Model Code of Practice: Managing risks of respirable crystalline silica in the workplace (guidance only; concrete, cement products, sand and cleanup can involve crystalline silica hazards).
  • Model Code of Practice: Hazardous manual tasks (guidance only).
  • Model Code of Practice: Managing noise and preventing hearing loss at work (guidance only).
  • Model Code of Practice: Managing the work environment and facilities (guidance only).
  • AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices; AS/NZS 1801 Occupational protective helmets; AS/NZS 2210.3 Safety footwear; AS/NZS 4602.1 High-visibility safety garments; AS/NZS 1270 Hearing protectors; AS/NZS 1337.1 Personal eye-protection; AS/NZS 2161.10 Occupational protective gloves.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionLandscaping ContractorsCivil Construction and EarthworksConcrete and Formwork

Related templates

$79.50

$96.80

Save $17.30

One-time payment