BlueSafe

Composite Repair SWMS

This SWMS covers composite repair work, including preparing the work area, removing damaged laminate, surface preparation, resin work, curing, inspection and restoration of service.

Activities covered include

  • Review the repair scope and establish the work area
  • Grind, sand and clean the substrate
  • Trim, inspect, clean up and restore service

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Composite Repair SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers composite repair work, including preparing the work area, removing damaged laminate, surface preparation, resin work, curing, inspection and restoration of service. It supports planning and risk management for dust, fibres, chemicals, vapours, ignition sources, tool use, stored energy and residual work-area hazards.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the repair scope and establish the work area
  • Isolate equipment and services before work begins
  • Check tools, extraction and ignition sources
  • Prepare, store and handle repair chemicals
  • Remove damaged laminate and prepare repair surfaces
  • Grind, sand and clean the substrate
  • Cut and dry-fit reinforcement materials
  • Measure, mix and apply resin
  • Bond, laminate, cure and monitor the repair
  • Trim, inspect, clean up and restore service

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out composite repair activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review repair scope
  • Incorrect repair method
  • Undetected structural damage
  • Incompatible repair materials
  • Unplanned high-risk work
Establish work area
  • Unauthorised entry
  • Slip and trip hazards
  • Exposure of others to dust
  • Vehicle or plant interaction
Isolate equipment and services
  • Unexpected plant movement
  • Electric shock
  • Stored pressure release
  • Release of process chemicals
Check tools and extraction
  • Tool kickback
  • Electrical fault
  • Dust release
  • Noise exposure
  • Fire from ignition source
Prepare chemicals safely
  • Chemical splash
  • Skin sensitisation
  • Flammable vapours
  • Incorrect chemical storage
  • Chemical incompatibility
Remove damaged laminate
  • Airborne fibreglass dust
  • Flying fragments
  • Hidden damage
  • Cuts from sharp laminate
  • Awkward postures
Grind and sand surfaces
  • Respirable composite dust
  • Noise and vibration
  • Eye injury
  • Heat damage to laminate
  • Ignition of dust or vapour
Clean and prepare substrate
  • Solvent vapours
  • Chemical splash
  • Surface contamination
  • Fire and explosion
  • Manual handling strain
Cut and dry-fit reinforcement
  • Incorrect fibre orientation
  • Cuts from tools
  • Manual handling strain
  • Contamination of materials
  • Waste material buildup
Measure and mix resin
  • Exothermic reaction
  • Chemical burns
  • Styrene or solvent vapour
  • Incorrect mix ratio
  • Spill or uncontrolled release
Bond and laminate repair
  • Skin contact with uncured resin
  • Bond failure
  • Entrapped air
  • Fibre contamination
  • Exposure to vapours
Cure and monitor repair
  • Thermal burns
  • Fire from overheating
  • Electrical fault
  • Uncontrolled cure cycle
  • Unauthorised disturbance
Trim and inspect repair
  • Dust from finishing
  • Sharp edges
  • Tool contact
  • Defective repair release
  • Noise exposure
Clean up and dispose
  • Chemical waste reaction
  • Fibreglass dust exposure
  • Fire from solvent waste
  • Environmental contamination
  • Manual handling injuries
Restore service and sign off
  • Premature return to service
  • Unexpected plant start-up
  • Incomplete documentation
  • Residual work-area hazards

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: How to manage work health and safety risks.
  • Model Code of Practice: Managing risks of hazardous chemicals in the workplace.
  • Model Code of Practice: Managing the risks of plant in the workplace (November 2024), including lock-out, isolation and verification controls.
  • Model Code of Practice: Managing electrical risks in the workplace.
  • Model Code of Practice: Managing the risk of falls at workplaces, where access or repair work presents a fall risk.
  • Safe Use of Reinforced Plastics Code of Practice guidance, including designated mixing areas, low-emission material selection, extraction and worker training.
  • AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices.
  • AS/NZS 1337.1 Personal eye-protection; AS/NZS 2161 Occupational protective gloves; AS/NZS 2210.3 Safety footwear; AS/NZS 1270 Hearing protectors; AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
  • AS/NZS 60079 series Explosive atmospheres where flammable vapour assessment identifies a hazardous area.
  • Manufacturer repair manual, product technical data sheets and current Safety Data Sheets (SDS).

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Manufacturing and ProductionAutomotive and MechanicalMining and Resources

Related templates

$79.50

$96.80

Save $17.30

One-time payment