Complex Lifting Plan Risk Assessment

$79.50

The Complex Lifting Plan Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Complex Lifting Plan Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Complex Lifting Plan Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper assessment of lift
    • Unclear communication
  • 2. Site Inspection
    • Uneven ground surfaces
    • Overhead obstructions
  • 3. Permit Acquisition
    • Incomplete documentation
    • Miscommunication with authorities
  • 4. Equipment Selection
    • Unsuitable lifting device
    • Poor condition of equipment
  • 5. Load Assessment
    • Incorrect weight estimation
    • Unstable load
  • 6. Risk Assessment Review
    • Overlooked hazards
    • Inadequate risk controls
  • 7. Competency Verification
    • Inexperienced operators
    • Lack of proper training
  • 8. Task Assignment
    • Misallocation of roles
    • Confusion in responsibilities
  • 9. Safety Briefing
    • Failure to communicate risks
    • Non-compliance with procedures
  • 10. Weather Check
    • Adverse weather conditions
    • Unexpected climatic changes
  • 11. Equipment Inspection
    • Hidden defects
    • Misreported condition
  • 12. Communication Setup
    • Ineffective signals
    • Equipment interference
  • 13. Barrier Installation
    • Insufficient barricades
    • Unauthorized access
  • 14. Emergency Plan Review
    • Inadequate emergency procedures
    • Lack of evacuation routes
  • 15. Load Securing
    • Inadequately secured load
    • Shift during lifting
  • 16. Lift Planning
    • Poor route planning
    • Ignored environmental factors
  • 17. Trial Lift
    • Unforeseen load behavior
    • Unanticipated equipment response
  • 18. Lift Execution
    • Equipment failure
    • Operator error
  • 19. Monitoring and Control
    • Inattentive supervision
    • Lack of monitoring technology
  • 20. Completion Procedures
    • Premature clearing of site
    • Missing documentation
  • 21. Post-Operation Review
    • Inadequate feedback collection
    • Failure to update risk management plans
  • 22. Documentation and Reporting
    • Loss of records
    • Inaccurate reporting
Shopping Cart