Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Complex Lift Planning Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparations
- Poorly maintained equipment
- Lack of proper safety wear
- 2. Risk Assessment
- Inadequate training
- not identifying all hazards
- 3. Crane Selection
- Incorrect crane selection
- overloading
- 4. Equipment Inspection
- Faulty equipment
- poor maintenance
- 5. Lift Area Setup
- Obstruction in the lift path
- unstable ground
- 6. Marking Out Work Area
- Incorrect marking
- lack of visibility
- 7. Pre-Lift Safety Meeting
- Miscommunication
- non-compliance to safety measures
- 8. Load Attachment
- Misalignment
- insecure attachment
- 9. Lifting Operations
- Swing accidents
- falling loads
- 10. Moving the Load
- Collisions
- load instability
- 11. Placement of Load
- Placement area not clear
- improper placement
- 12. Weather Conditions
- Strong winds
- lightening
- 13. Emergency Procedures
- Lack of understanding
- panic situations
- 14. Post Operation Assessment
- Negligence to report faults
- misjudgment
- 15. Clean-up operations
- Trips and falls
- left-over debris
- 16. Debriefing/Feedback
- Non-compliance
- lack of understanding
- 17. Maintenance & Repair
- Improper methods
- untrained personnel
- 18. Documentation & Reporting
- Overlooked errors
- improper reporting
- 19. Load Removal
- Unsafe methods
- load instability during removal
- 20. Inspection of Work Area
- Hazards left unaddressed
- overlooking minor issues