Climbing Into Cranes Safe Work Method Statement (SWMS)

$96.80

The Climbing Into Cranes Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Climbing Into Cranes Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Climbing Into Cranes Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Climbing Into Cranes Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Climbing Into Cranes Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Climbing Into Cranes Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Climbing Into Cranes Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate equipment
    • Unsecured area
  • 2. Pre-Operation Inspection
    • Poor visibility
    • Improper training
  • 3. Climbing onto Crane
    • Falls from height
    • Collisions with objects
  • 4. Securing the Area
    • Contact with electricity
    • Struck by moving object
  • 5. Operating the Crane
    • Mechanical failure
    • Overturning of crane
  • 6. Maintenance
    • Machinery caught-in/between
    • Falls from height
  • 7. Emergency Procedures
    • Miscalculation of load
    • Unplanned collapse
  • 8. Offboarding the Crane
    • Falls from height
    • Slips and trips
  • 9. Crane Storage
    • Objects falling from height
    • Unauthorized usage
  • 10. Post-Operation Inspection
    • Injury from faulty equipment
    • Fire hazard
  • 11. Repair & Replacement
    • Electrical short-circuit
    • Injured by defective parts
  • 12. Compliance Check
    • Non-compliance to regulations
    • Legal implications
  • 13. Equipment Cleaning
    • Exposure to harmful substances
    • Chemical burns
  • 14. Hazard Reporting
    • Delayed reporting
    • Communication breakdown
  • 15. Training Program
    • Improper training materials
    • Insufficient safety rigging
  • 16. Regular Equipment Upgrades
    • Old equipment hazards
    • Resistance to change
  • 17. Routine Checks
    • Missed hazards
    • Inadequate checks
  • 18. Safety Briefings
    • Miscommunication of safety protocols
    • Information overload
  • 19. Practice Drills
    • Operational confusion
    • Panic during emergency scenario
  • 20. Lessons Learned Review
    • Omission of important information
    • Improper documentation

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Climbing Into Cranes Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart