“`html
Introducing the Safe Work Method Statement (SWMS) Template for Clear Blocked Drains with Chemical MOMAR – your trusted guide to maintaining a safe and compliant work environment. Tailored specifically for tradespeople, this practical template serves as a foundational document to aid in managing occupational safety risks effectively. Here’s what our SWMS template offers:
- Pre-filled and Comprehensive: Our template comes pre-filled with relevant information, making it easy to use from day one. It’s detailed yet straightforward to ensure you have pertinent data right at your fingertips.
- Fully Editable and Customisable in Microsoft Word Format: Need to make adjustments? No worries. The template is fully editable in Microsoft Word, allowing seamless customisation to fit your unique needs or site-specific requirements.
- Includes the Scope of the Project and the Project Details: Clearly define your project scope and specific details within the template, which helps set clear expectations and guidelines for all involved parties.
- Checklist of Any High-Risk Machinery on Site: Keep safety front of mind with a checklist that identifies any high-risk machinery on site, ensuring proactive measures can be implemented.
- Space for Recording Any Staff Training: Documenting training is essential. This template includes an area dedicated to recording staff training sessions, keeping you compliant and informed.
- Before and After Risk Ratings: Assess and mitigate risks more effectively by capturing the risk ratings before and after implementing control measures.
- Resources for Use of Legislative References: Stay up-to-date and compliant with access to legislative references readily available within the template.
- Includes All PPE Required: Specify and record all necessary personal protective equipment (PPE), which ensures workers are properly equipped for the job.
- Risk Assessment and Risk Assessment Matrix: Conduct thorough hazard analysis using the included risk assessment tool and matrix, aiding in identifying, assessing, and prioritising workplace hazards efficiently.
- Checklist to Ensure All Requirements Are Covered: Use the built-in checklist to ensure that all necessary requirements are addressed when implementing the SWMS, preventing any oversight.
- Sign Off Page for All Workers and Responsible Persons: Create accountability with a sign-off page meant for all workers and responsible persons, reinforcing commitment to safety practices.
- Easy to Use, Easy to Customise: Whether you’re tech-savvy or not, the simplicity of this template makes it user-friendly and adaptable without hassle.
- Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: This versatile resource meets the demands of large-scale projects, including tier 1 contractual obligations.
- Quick Delivery by Email: Once you place an order, expect quick delivery directly to your inbox, ensuring you have what you need right when you need it.
With our SWMS template, you have the support you need to foster a safer worksite while meeting necessary compliance requirements – specifically crafted with practicality and ease of use for tradies like you.
“`
The Clear Blocked Drains with Chemical MOMAR Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Chemical exposure
- slips and trips
- 2. Site Assessment
- Unstable ground
- nearby utilities
- 3. PPE Selection
- Incorrect PPE selection
- PPE failure
- 4. Equipment Inspection
- Mechanical failure
- incorrect tools
- 5. Hazard Identification
- Undiscovered hazards
- environmental risks
- 6. Accessing Site
- Uneven surfaces
- vehicle traffic
- 7. Determining Drainage
- Exposure to chemicals
- hidden objects
- 8. Handling Chemicals
- Spills
- inhalation of fumes
- 9. Applying Chemicals
- Overexposure
- incorrect application
- 10. Observing Reaction
- Fume generation
- chemical splash
- 11. Flushing Drains
- High water pressure
- backflow
- 12. Revisiting Blockages
- Further blockage
- equipment damage
- 13. Re-assessment
- Incomplete clearance
- residual hazards
- 14. Clean-up Procedures
- Chemical residues
- disposal issues
- 15. Equipment Cleaning
- Chemical burns
- slipping hazards
- 16. Decontamination
- Contact with hazardous material
- leakage
- 17. Waste Disposal
- Improper disposal
- environmental impact
- 18. Site Restoration
- Trip hazards
- incomplete restoration
- 19. Final Inspection
- Overlooked issues
- residual chemicals
- 20. Documentation
- Inaccurate records
- incomplete details
- 21. Review and Feedback
- Inadequate feedback
- missed improvements
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Clear Blocked Drains with Chemical MOMAR Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


