BlueSafe

Cladding Risk Assessment

This risk assessment covers planning, access, material handling, cladding work, work at height and site close-out activities.

Activities covered include

  • Plan work areas, access, material placement and site set-up
  • Cut, drill and fix cladding materials
  • Manage offcuts, dust, straps, fixings and end-of-shift conditions

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Cladding Risk Assessment
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This risk assessment covers planning, access, material handling, cladding work, work at height and site close-out activities. It supports identifying hazards and planning controls for workers, materials, tools, weather and nearby people.

Activities & Risks Covered

This assessment addresses activities and risks including:

  • Plan work areas, access, material placement and site set-up
  • Manage deliveries, loading areas and cladding material handling
  • Control work at height, edges, openings and dropped-object risks
  • Use scaffolds, ladders and EWPs for access
  • Cut, drill and fix cladding materials
  • Manage electrical services, temporary power and overhead powerline exposure
  • Plan work for wind, wet surfaces, heat, sun and poor weather
  • Coordinate with adjacent trades, mobile plant and members of the public
  • Manage offcuts, dust, straps, fixings and end-of-shift conditions

Who is this for?

For contractors, workers, supervisors and businesses carrying out cladding activities.

Activities & Hazards Covered

Activity Potential Hazards
Planning, access and site set-up
  • Unplanned work areas creating clashes with other trades or occupants
  • Poor access or unstable ground for ladders, scaffolds or EWPs
  • Materials placed in unsuitable locations creating manual handling and fall exposure
  • Inadequate emergency access, rescue arrangements or communication
Deliveries, loading areas and material handling
  • Struck by moving vehicles, forklifts or loads
  • Crush injuries during unloading or shifting packs
  • Musculoskeletal strain from lifting, carrying or awkward postures
  • Cuts from sharp cladding edges, straps and packaging
Work at height and edge exposure
  • Falls from roofs, slab edges, penetrations, voids or incomplete structures
  • Falls from ladders, scaffolds or EWPs
  • Dropped tools or materials striking people below
  • Swing or ejection risk when using boom-type EWPs
Scaffold, ladder and EWP use
  • Collapse, overturning or movement of access equipment
  • Entrapment or crush against structures
  • Use of unsuitable or defective plant
  • Unauthorised or untrained operation
Cutting, drilling and fixing cladding
  • Lacerations, eye injuries or entanglement from tools and sharp materials
  • Respirable dust, including silica where applicable
  • Noise and vibration exposure
  • Flying particles and tool kickback
Electrical services and overhead powerlines
  • Electric shock from damaged leads, tools or temporary power
  • Contact with concealed services while fixing or drilling
  • Arcing or electrocution near overhead powerlines
  • Trip hazards from trailing leads
Weather, wind and environmental conditions
  • Loss of control of large panels in wind
  • Slips on wet surfaces or unstable footing
  • Heat stress, dehydration or sun exposure
  • Reduced visibility during poor weather
Public interface, adjacent trades and dropped objects
  • Members of the public or other workers entering the work area
  • Dropped panels, tools or fixings striking persons below
  • Clashes with mobile plant, deliveries or other construction activities
  • Poor communication causing unexpected exposure
Waste, housekeeping and end-of-shift condition
  • Trips, slips and puncture injuries from offcuts, swarf, straps and fixings
  • Dust release during clean-up
  • Manual handling strain when removing waste
  • Unsecured partially completed work becoming unstable after hours

Need to tailor this risk assessment?

Use the BlueSafe Portal to add site-specific activities, hazards, controls, responsibilities and review details before the assessment is put into use.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template records model guidance used to inform the documented controls. Applicable WHS/OHS laws and adopted Codes vary by state or territory, so confirm the current local requirements when tailoring the assessment:

  • Model guidance: Model Code of Practice: Managing the risk of falls at workplaces — 3.2 Identifying the hazards; p. 16.
  • Model guidance: Model Code of Practice: Hazardous manual tasks — 4.1 The hierarchy of control measures; p. 31.
  • Model guidance: Model Code of Practice: Managing electrical risks in the workplace — 2.1 Identifying the hazards; p. 14.
  • Model guidance: Model Code of Practice: Managing the work environment and facilities — 2. The work environment; p. 13.
  • Model guidance: Model Code of Practice: Construction work — 6.2 Workplace specific induction training; p. 41.
  • Model guidance: Model Code of Practice: First aid in the workplace — 3. First aid equipment, facilities and training; p. 12.
  • Model guidance: Model Code of Practice: Managing noise and preventing hearing loss at work — 5. Controlling the risks; p. 29.
  • Model guidance: Model Code of Practice: Managing risks of plant in the workplace — Plant hazard identification — Traffic movements in the workplace; p. 17.

Standard Risk Assessment Features (Click to Expand)
  • Activity-specific hazard identification and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each activity
  • Risk matrix and assessment classification
  • Review, monitoring and sign-off fields
  • Site-specific customisation before use

Suitable for Industries

Building and ConstructionRoofing Contractors

Related templates

$79.50

One-time payment