Chemicals Handling And Use Safe Work Method Statement (SWMS)

$96.80

The Chemicals Handling And Use Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Chemicals Handling And Use Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

If you’re knee-deep in the world of trade, then our Safe Work Method Statement Template for Chemicals Handling and Use will be a handy companion. Not only does it take the fuss out of OH&S compliance paperwork; its streamlined style also allows it to be easily customisable to your needs.

  • Pre-filled and Comprehensive: You won’t need to fret about missing key requirements with this comprehensive guide. We’ve done that hard work of filling in the necessary details for you!
  • Fully editable and customisable in Microsoft Word format for easy editing: Our design is as flexible as a gymnast. Simply open it in Word and tailor it to fit your project.
  • Includes the scope of the project and the project details: No aspect of the job is too large or small for this template. Feed it the information, and it’ll accomodate both the project’s breadth and detail smoothly.
  • Includes checklist of any high risk machinery on site: Stay vigilant over potential hazards lurking in your machinery yard. This handy feature lets you keep track and manage these technological beasts.
  • Includes space for recording any staff training: Skill development should never go unnoticed! Record all staff trainings so everyone gets the recognition they deserve.
  • Includes before and after risk ratings: Want to measure how effective your precautions are? Assess the risk before and after implementation. It’s your own personal safety experiment!
  • Includes resources for use of legislative references: Let’s face it, legislative jargon can be mind-numbing. Rest easy knowing the template includes simple-to-understand resources to guide you through these tricky paths.
  • Includes all PPE required: Ensuring everyone is kitted up correctly has never been easier. This feature outlines every piece of Personal Protective Equipment needed on the job.
  • Includes risk assessment and risk assessment matrix: If you love being organised, this one’s for you! With these features, you can rate and rank your risks in a visually appealing way.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: No nasty surprises here. The included checklist will make sure you’ve got everything under control.
  • Includes sign off page for all workers and responsible persons: Keep everyone accountable with our handy sign-off page feature. So you know exactly who’s looked over what.
  • Easy to use, easy to customise: We’ve designed this template to be as user-friendly as possible. If you know your way around a Word doc, you’re good to go!
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Don’t worry if you’re dealing with a big fish. Our template can handle it!
  • Quick delivery by email: You’re busy. We get it. That’s why we’ll zip the template straight to your inbox, quick as a flash.

Remember, this Safe Work Method Statement Template for Chemicals Handling And Use is there to help you navigate safety and health requirements comfortably and confidently but isn’t an invincible shield against all hazards. Always stay alert, and above all, keep your worksite safe!


The Chemicals Handling And Use Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect storage
    • Exposure to chemical fumes
  • 2. Equipment Check
    • Equipment malfunction
    • Exposure to hazardous materials
  • 3. Personnel Training
    • Misuse of equipment
    • Lack of awareness about chemicals
  • 4. Chemical Handling
    • Liquid spill
    • Skin contact with chemicals
  • 5. Transportation
    • Possible collision
    • Leakage during transit
  • 6. Pouring & Mixing
    • Chemical burn
    • Inhalation of toxic gases
  • 7. Disposal
    • Incorrect disposal method
    • Exposure to residual chemicals
  • 8. Clean Up
    • Exposure to residual chemicals
    • Skin contact with cleaning solvents
  • 9. Reporting
    • Non-reporting of incidents or accidents
    • Incomplete hazard documentation
  • 10. Control Measures Review
    • Lack of review & regulation updates
    • Missed hazards
  • 11. Emergency Service Coordination
    • Delayed response
    • Miscommunication
  • 12. Decommissioning and Storage
    • Improper sealing
    • Exposure to stored chemicals
  • 13. Incident Follow Up
    • Non-compliance with safety standards
    • Lack of regular audits
  • 14. Regular Inspection & Maintenance
    • Malfunction due to wear & tear
    • skipped inspections
  • 15. Safety Briefings
    • Miscommunication of safety procedures
  • 16. Hazard Communication and Labelling
    • Improper labeling
    • misunderstanding information
  • 17. Chemical Storage and Control
    • Incorrect storage
    • exposure to chemical fumes
  • 18. Worker Protection
    • Insufficient protective gear
    • unaware of hazard protections
  • 19. Monitoring
    • Lack of hazard monitoring
    • faulty sensors
  • 20. Risk Assessment Updates
    • Outdated risk assessments
    • overlooked changes in procedure

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Chemicals Handling And Use Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart