Cantilevered Crane Loading Platforms Safe Work Method Statement (SWMS)

$96.80

The Cantilevered Crane Loading Platforms Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Cantilevered Crane Loading Platforms Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Cantilevered Crane Loading Platforms Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Cantilevered Crane Loading Platforms Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Cantilevered Crane Loading Platforms Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Cantilevered Crane Loading Platforms Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Cantilevered Crane Loading Platforms Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Falling objects
    • Trip hazards
    • Incorrect manual handling
  • 2. Delivery and Unloading
    • Traffic accidents
    • Incorrect lifting procedures
    • Falling objects
  • 3. Set Up and Levelling
    • Crushing and pinching injuries
    • Equipment failure
  • 4. Inspection of Platforms
    • Risky access
    • Rusty or broken parts
    • Electrical hazards
  • 5. Outriggers extension
    • Collision with surrounding objects
    • Overloading
  • 6. Lift Planning
    • Improper rigging
    • Load over capacity
  • 7. Load attaching
    • Incorrect attachment
    • Inadequate equipment
    • Dropped loads
  • 8. Hoisting
    • Overhead power lines
    • Personnel within swing radius
    • Uneven ground conditions
  • 9. Positioning the Load
    • Communication problems
    • Struck by falling objects
    • Crashing against other loads
  • 10. Detaching the Load
    • Loose rigging
    • Load instability
    • Dropped loads
  • 11. Crane breakdown
    • Machinery malfunction
    • Lack of maintenance
  • 12. Regular Checks and Maintenance
    • Incorrect procedure
    • Defective equipment
  • 13. Emergency response
    • Inadequate training
    • Ineffective communication
  • 14. Packing up
    • Incorrect manual handling
    • Falling objects
  • 15. Reporting
    • Paperwork errors
    • Miscommunication
    • Lost reports

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Cantilevered Crane Loading Platforms Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart