Safe Work Method Statement Template for Brick PavingG’day! Navigating the world of safety documentation can feel like a hassle, but our Safe Work Method Statement (SWMS) Template for Brick Paving is here to lend a hand. Designed with practicality and ease-of-use in mind, our template is perfect for anyone involved in brick paving—whether you’re laying the groundwork for a major construction project or just doing a bit of touch-up work at home.
- Pre-filled and Comprehensive: We’ve pre-filled the template to give you a solid starting point. It’s comprehensive enough to cover most of the bases you could think of, from basic job steps to potential hazards.
- Fully Editable and Customisable in Microsoft Word Format: The document opens up like a dream in MS Word, giving you the freedom to tweak and tailor it till it fits just right for your specific project needs.
- Includes the Scope of the Project and the Project Details: Capture all the important details that matter. From start dates to project scope, we’ve included sections for you to fill in all those vital bits of information so everyone knows what they’re in for.
- Includes Checklist of Any High-Risk Machinery on Site: High-risk gear can be a real safety concern. Our template includes an easy-to-follow checklist to ensure all high-risk machinery is accounted for and checked over before the day’s work begins.
- Includes Space for Recording Any Staff Training: Keep track of all employee training by using dedicated sections for recording who’s been trained on what. This can help reinforce commitment to safety and skill development.
- Includes Before and After Risk Ratings: Identify risks and take them from “whoops” to “all clear” with our handy before-and-after risk rating system built right into the template.
- Includes Resources for Use of Legislative References: Navigate through the legal mumbo jumbo with ease. We’ve included references to relevant Australian legislation that might come in handy for compliance checks.
- Includes All PPE Required: We take personal protective equipment seriously. Find a complete list of suggested PPE gear aligned with worksite requirements to keep everyone safe proper as they should be.
- Includes Risk Assessment and Risk Assessment Matrix: Break down each task easily with detailed risk assessments and accompanying matrix. It offers clarity when identifying the likelihood and consequence of risks.
- Includes a Checklist to Ensure All Requirements Have Been Covered When Implementing the SWMS: Get everything ticked off with a straightforward checklist to make sure not a single requirement slips through the cracks.
- Includes Sign Off Page for All Workers and Responsible Persons: At the end of the day, everyone needs to sign off. With our straightforward sign-off page, confirming review and understanding of the SWMS is simple and clear.
- Easy to Use, Easy to Customise: Built to be user-friendly, setting up your SWMS is a breeze so you can spend more time focusing on what you do best—laying bricks like a pro!
- Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: Whether you’re going solo or part of a big operation, this template accommodates projects of all scales. Perfect for that critical tender moment or tier 1 contractual work.
- Quick Delivery by Email: No waiting around! Once ordered, you’ll receive your SWMS template straight to your inbox quicker than you can say “smoko”.
So have a closer look if you’re keen on making your brick paving worksites safer and more organised. Drop us a line, and let’s get you set up sooner rather than later!
The Brick Paving Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Incorrect measurements
- poor planning
- 2. Delivery
- Heavy loads
- vehicle movements
- 3. Site Inspection
- Uneven ground
- unseen obstacles
- 4. Excavation
- Underground services
- loose soil
- 5. Base Prep
- Dust inhalation
- adjacent structure stability
- 6. Sand Laying
- Silica dust
- eye irritation
- 7. Laying Pavers
- Manual handling injuries
- repetitive strain
- 8. Cutting Pavers
- Flying debris
- noise pollution
- 9. Levelling
- Trip hazards
- improper alignment
- 10. Compacting
- Vibration injuries
- machinery malfunction
- 11. Cleaning
- Slip hazards
- chemical exposure
- 12. Sealing
- Chemical fumes
- skin contact
- 13. Edge Restraint
- Improper installation
- tripping hazards
- 14. Drainage Setup
- Water flow issues
- uneven surfaces
- 15. Quality Check
- Inconsistent levels
- missed defects
- 16. Final Cleanup
- Waste disposal
- equipment return
- 17. Site Access
- Public interaction
- unauthorised access
- 18. Equipment Check
- Equipment failure
- lack of maintenance
- 19. Weather Issues
- Wet conditions
- heat stress
- 20. Communication
- Miscommunication
- inadequate signage
- 21. Emergency Prep
- Lack of emergency response plan
- inadequate training
- 22. First Aid
- Insufficient supplies
- untrained personnel
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Brick Paving Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


