“`html
Safe Work Method Statement (SWMS) Template for Brick Manufacturing
Introducing our Safe Work Method Statement Template, specifically designed for the brick manufacturing industry. This tool offers a solid foundation to help ensure workplace safety and compliance without becoming a headache. Let’s look at the features that make this template a handy resource for your worksite:
- Pre-filled and Comprehensive: We’ve done some of the heavy lifting for you! Our template comes with pre-filled information that’s been thoughtfully compiled to address common risks and scenarios in brick manufacturing.
- Fully editable and customisable in Microsoft Word format: No fuss, no complicated software. Open it in Microsoft Word, edit to your heart’s content, and tailor it specifically to match the unique requirements of your site.
- Includes the scope of the project and the project details: Clearly outline what the job involves, helping all team members understand the breadth of the task right from the start. Clarity from day one!
- Includes checklist of any high risk machinery on site: Spot high-risk machinery with ease. This checklist ensures you’re aware of potential hazards before they become problems.
- Includes space for recording any staff training: Keep tabs on who’s trained and ready for action. Documenting this is key for both safety standards and peace of mind.
- Includes before and after risk ratings: Measure the effectiveness of your safety measures by comparing risk levels from start to finish. It’s about improvement through visibility.
- Includes resources for use of legislative references: Stay on top of the current regulations. Having this at hand means you’ll know where to look for the most up-to-date legal requirements.
- Includes all PPE required: Ensure your team suits up correctly with a comprehensive list of Personal Protective Equipment necessary for safe operations on site.
- Includes risk assessment and risk assessment matrix: Systematically assess and categorise risks with a matrix designed to simplify even the most complex hazards. Always be prepared, never caught out.
- Includes a checklist to ensure all requirements have been covered when implementing the SWMS: This step-by-step guide helps you tick off every box to ensure nothing slips through the cracks.
- Includes sign off page for all workers and responsible persons: Create accountability and assurance with documented acknowledgments from each team member. Everyone knows their role and responsibilities.
- Easy to use, easy to customise: User-friendly and intuitive, making it accessible for everyone from casual labourers to higher management.
- Suitable for large contracts and Tenders, including tier 1 contractual work: Reliable and robust enough for even your biggest projects. Be it large-scale contracts or smaller jobs, this template adapts beautifully.
- Quick delivery by email: Once purchased, we understand there’s no time to waste – receive your template promptly via email and get straight to work.
This isn’t just a document; it’s a guide crafted to support your commitment to safety and efficiency on the ground. Get started today and see how implementing thoughtful planning can enhance the way you operate on site.
“`
This HTML snippet provides an organised and detailed product description for the SWMS Template. It’s intended to be informative while maintaining a conversational tone suitable for tradespeople.
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Brick Manufacturing Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.
Preview not available for this product.
Frequent Questions
Safe Work Method Statement Template FAQ’s
What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?
Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.
How many pages long is each Safe Work Method Statement Template?
It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.
What are before and after risk ratings?
Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.
Why do the Safe Work Method Statement Templates have before and after risk ratings?
Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.
Are the SWMS Templates pre-filled?
Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.
Do the Safe Work Method Statement Templates come with a Risk Assessment?
Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.
Does each SWMS Template have the required PPE already suggested?
Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.
What Should be Included in a Safe Work Method Statement?
If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.
Your Safe Work Method Statement must:
- List or show the different types of construction work that is high risk
- Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
- Explain in detail how each risk will be managed, maintained and controlled
- Explain how each control measure will be implemented in order to reduce each risk
- Describe how each control measure will be monitored an how often the control measures will be reviewed
- Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
- Be made available and accessible to read by employees and applicable personnel at any time.
- Every SWMS should be easy to understand and written in plain language
- Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.