Bolting Heavy Components Safe Work Method Statement (SWMS)

$96.80

The Bolting Heavy Components Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Bolting Heavy Components Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Bolting Heavy Components Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Bolting Heavy Components Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Bolting Heavy Components Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Bolting Heavy Components Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Bolting Heavy Components Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip and fall hazards
    • Injury from manual handling
  • 2. Pre-Check
    • Hand injuries
    • Eye injury from flying debris
  • 3. Position Equipment
    • Trapped fingers or hands
    • Back injury from heavy lifting
  • 4. Assemble Bolts & Washers
    • Hand injuries from sharp edges
    • Eye injury from flying objects
  • 5. Install Components
    • Falling objects
    • Injuries from improper use of tools
  • 6. Adjusting Alignment
    • Trapped finger/hand
    • Injury from falling object
  • 7. Start Bolting
    • Hand injuries
    • Arm strain
  • 8. Tighten Bolts
    • Strain and sprains
    • Injuries from repetitive motions
  • 9. Inspecting Work
    • Eye strain
    • Falls from height when inspecting
  • 10. Clean Up
    • Slips
    • trips
    • and falls
    • Cuts from not properly disposed waste materials
  • 11. Post-Operation Checks
    • Injuries from remaining energised equipment
    • Burns from hot surfaces
  • 12. Report and Review
    • Psychological stress from incident reporting
    • Repetitive strain injury from computer work
  • 13. Maintenance
    • Electric shock
    • Burns from hot parts
  • 14. Decommissioning
    • Exposure to hazardous substances
    • Release of stored energy
  • 15. Waste Disposal
    • Skin irritation due to contact with hazardous substance
    • Ingestion/inhalation of hazardous substance

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Bolting Heavy Components Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart