Bobbin Sander Use Safe Work Method Statement (SWMS)

$96.80

The Bobbin Sander Use Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Bobbin Sander Use Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Bobbin Sander Use Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Bobbin Sander Use Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Bobbin Sander Use Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Bobbin Sander Use Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Bobbin Sander Use Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Injury from improper handling
    • Inadequate training
  • 2. Machine Inspection
    • Electrical faults
    • dust accumulation
  • 3. Personal Protective Equipment (PPE) Fitting
    • Incorrect fit of PPE
    • absence of PPE
  • 4. Loading Timber
    • Manual handling injuries
    • slipping and tripping over wood
  • 5. Machine Start Up
    • Unexpected start
    • debris ejection
  • 6. Sanding Operation
    • Noise exposure
    • vibrations
    • cutting & entanglement hazards
  • 7. Adjusting Machine Settings
    • Unauthorised adjustment
    • incorrect adjustment leading to accidents
  • 8. Replacing Sandpaper Roll
    • Finger entrapment
    • cuts
    • machine starts unexpectedly
  • 9. Unloading Timber
    • Manual handling injuries
    • timber splinters
  • 10. Machine Shut Down
    • Incorrect shutdown procedure
    • developing bad habits
  • 11. Cleaning Up
    • Exposure to dust
    • eye injury from flying debris
    • cuts from sharp waste
  • 12. Maintenance
    • Unplanned machine movement
    • inadequate lockout or tag procedures
  • 13. Reporting And Documentation
    • Overlooking reportable incidents due to misunderstood regulation
    • negligence
  • 14. Emergency Procedures
    • Inadequate learning of emergency procedures
    • incorrect execution in panicked situations
  • 15. Regular Review
    • Missing scheduled review
    • overlooking potential future hazards
  • 16. Storage
    • Improper storage leading to accidents
    • potential fire hazard due to flammable materials
  • 17. Disposal
    • Inappropriate disposal techniques
    • not adhering to waste management regulations
  • 18. Training
    • Lack of ongoing training
    • lack of familiarity with machine upgrade or changes
  • 19. Supervision
    • Absence of adequate supervision
    • avoiding established safety protocol in absence of supervisor
  • 20. Hazardous Waste Management
    • Improper waste segregation
    • exposure to hazardous waste

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Bobbin Sander Use Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart