BlueSafe
Commercial and Professional Diving SWMS

Commercial and Professional Diving SWMS

  • -100% Compliant with Australian WHS Acts & Regulations
  • -Fully Editable MS Word & PDF Formats Included
  • -Pre-filled Content - Ready to Deploy Immediately
  • -Customisable - Easily Add Your Logo & Site Details
  • -Includes 2 Years of Free Compliance Updates

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Product Overview

This SWMS covers commercial and professional diving, including planning, equipment preparation, underwater work, decompression, emergency response and close-out. It supports planning and risk management for breathing gases, vessel activities, dive hazards, pressure and recovery tasks.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the dive scope, plan, competence and fitness considerations
  • Set up the site and water exclusion area
  • Load the vessel, position plant and manage equipment handling
  • Prepare breathing gases and inspect dive and rescue equipment
  • Conduct the pre-dive briefing and equipment checks
  • Manage water entry, descent and planned underwater work
  • Manage decompression, ascent and recovery
  • Operate chamber and treatment activities where required
  • Respond to diving emergencies, decontaminate equipment and close out

Who is this for?

For contractors, workers, supervisors and businesses carrying out commercial and professional diving activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review scope and dive plan
  • Unplanned diving activity
  • Inadequate diver competence
  • Medical unfitness
  • Incorrect decompression profile
  • Fatigue and impaired judgement
Establish site and water exclusion
  • Unauthorised water entry
  • Vessel strike
  • Vehicle and plant interaction
  • Fall into water
  • Public exposure to diving operations
Load vessel and position plant
  • Manual handling strain
  • Dropped cylinders
  • Crush from lifting gear
  • Vessel instability
  • Fuel or battery ignition
Prepare breathing gases
  • Oxygen-enriched fire
  • Gas contamination
  • Cylinder overpressure
  • Incorrect gas mixture
  • Asphyxiation from gas release
Inspect dive and rescue equipment
  • Air-supply failure
  • Umbilical entanglement
  • Communication loss
  • Equipment malfunction
  • Inadequate bailout supply
Conduct pre-dive briefing
  • Signal misunderstanding
  • Buddy separation
  • Incorrect equipment fitting
  • Panic response
  • Uncontrolled entry
Enter water and descend
  • Slip during entry
  • Rapid descent
  • Barotrauma
  • Current separation
  • Entanglement at entry point
Perform planned underwater work
  • Entanglement and entrapment
  • Drowning from gas loss
  • Low visibility disorientation
  • Marine animal injury
  • Underwater tool injury
  • Contaminated water exposure
  • Crush from suspended load
Manage decompression and ascent
  • Decompression sickness
  • Arterial gas embolism
  • Oxygen toxicity
  • Rapid ascent
  • Loss of decompression gas
Operate chamber and treatment
  • Pressure vessel failure
  • Fire in oxygen-rich atmosphere
  • Incorrect pressurisation
  • Thermal stress
  • Entrapment in chamber
Respond to diving emergency
  • Unconscious diver
  • Drowning
  • Decompression illness
  • Missing diver
  • Delayed emergency response
De-kit and decontaminate
  • Contaminated equipment
  • Manual handling strain
  • Sharps injury
  • Residual cylinder pressure
  • Slip hazards
Demobilise and close out
  • Unsecured equipment during transport
  • Fatigue after diving
  • Incomplete records
  • Environmental contamination
  • Unauthorised restart

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model WHS Regulations, Part 4.8 Diving Work, as adopted or applied in the relevant jurisdiction.
  • Model Code of Practice: How to Manage Work Health and Safety Risks.
  • Model Code of Practice: Managing Risks of Plant in the Workplace.
  • Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace.
  • Model Code of Practice: Hazardous Manual Tasks.
  • Model Code of Practice: Confined Spaces.
  • Model Code of Practice: Managing the Work Environment and Facilities.
  • AS/NZS 2299.1 Occupational diving operations—Standard operational practice.
  • AS/NZS 2299.2 Occupational diving operations—Surface-supplied breathing apparatus.
  • AS/NZS 2815 Training and certification of occupational divers.
  • AS 2030.1 Gas cylinders—General requirements.
  • AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment.
  • AS/NZS 1337 Personal eye-protection equipment.
  • AS/NZS 1801 Occupational protective helmets.
  • AS/NZS 2210.3 Personal protective equipment—Safety footwear.
  • AS/NZS 1270 Acoustics—Hearing protectors.
  • AS/NZS 4602.1 High visibility safety garments.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionCivil Construction and EarthworksMining and Resources

Related templates

$79.50

$96.80

Save $17.30
Safe Work Australia Aligned