Assembling Flat Pack Furniture Safe Work Method Statement (SWMS)

$96.80

The Assembling Flat Pack Furniture Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Assembling Flat Pack Furniture Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Assembling Flat Pack Furniture Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Assembling Flat Pack Furniture Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Assembling Flat Pack Furniture Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Assembling Flat Pack Furniture Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Assembling Flat Pack Furniture Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate workspace
    • improper lifting procedures
  • 2. Unpacking flat packs
    • Sharp object punctures
    • heavy lifting injuries
  • 3. Equipment check
    • Faulty tools
    • inadequate personal protective equipment (PPE)
  • 4. Assemble base
    • Incorrect assembly causing instability
    • pinched fingers
  • 5. Attach side panels
    • Improper tool use
    • finger entrapment
  • 6. Install interior fittings
    • Improper lifting
    • risk of item falling on worker
  • 7. Attaching doors
    • Incorrect door alignment
    • pinch points
  • 8. Attaching hardware
    • Small parts choking hazard
    • misuse of tools
  • 9. Installing drawers
    • Incorrect assembly
    • collision hazards
  • 10. Finishing
    • Exposure to harmful chemicals
    • sharp edges
  • 11. Inspection
    • Missing components
    • incorrect assembly
  • 12. Cleaning work area
    • Exposure to harmful substances
    • trip hazards
  • 13. Treatment of waste
    • Improper handling of packaging materials
  • 14. Final product inspection
    • Defective pieces or parts
  • 15. Moving finished product
    • Improper lifting technique
    • collision with objects
  • 16. Documenting assembly work
    • Miscommunication in handover processes

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Assembling Flat Pack Furniture Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart