Asphalt Milling Machine Safe Work Method Statement (SWMS)

$96.80

The Asphalt Milling Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Asphalt Milling Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Introducing our Safe Work Method Statement (SWMS) Template for Asphalt Milling Machine! This thoughtfully-crafted product is streamlined to suit your workplace needs, particularly favouring tradespeople who require clarity and ease of use. Let’s take a look at its key features:

  • Pre-filled and Comprehensive: Our SWMS template takes away the stress of figuring out where to start. It comes pre-filled with essential details you may need so that you can focus on adding specifics relevant to your project.
  • Fully Editable and Customisable in Microsoft Word Format: Modify and personalise this document as much as you like – it’s yours. Our SWMS template is designed in a user-friendly Word format specially for easy editing to fit your project requirements.
  • Includes the Scope of the Project and Project Details: Don’t sweat over missing or forgetting crucial project information. Our template ensures all pertinent details and project scope are well-documented.
  • Includes a Checklist of Any High-Risk Machinery On Site: We understand the risk involved in operating high-risk machinery. Therefore, our SWMS template includes a robust, user-friendly checklist to keep you alert always.
  • Includes Space for Recording Any Staff Training: Capturing who’s had what training is critical. Hence, we’ve devoted space for recording staff training sessions, promoting adherence to safety measures.
  • Includes Before and After Risk Ratings: This embedded feature allows you to measure the efficacy of your safety efforts by comparing risk levels before and after implementation.
  • Includes Resources for Use of Legislative References: Keeping abreast with statutory rules is necessary, so our template includes helpful resources for cross-checking relevant legislation.
  • Includes All PPE Required: We’ve listed out essential Personal Protective Equipment (PPE) for you, ensuring everyone’s safety at the workplace.
  • Includes Risk Assessment and Risk Assessment Matrix: Assess potential hazards concerning your asphalt milling machine operations with a handy risk assessment feature plus a matrix for visual clarity.
  • Includes Checklist to Ensure All Requirements Have Been Covered: Streamline your work process without missing out any critical details using this convenient checklist.
  • Includes Sign Off Page For All Workers And Responsible Persons: Accountability is vital. Therefore, our SWMS includes a sign-off page where all workers and responsible persons can confirm their comprehension and compliance with the safety processes discussed.
  • Easy to Use, Easy To Customise: Designed for tradespeople like you to navigate and edit – let’s say we’ve made it ‘tradie-friendly’!
  • Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: This template is created to cater to all scales of operation; from big contracts to smaller projects – it tackles them all!
  • Quick Delivery by Email: In a rush? No worries! Once it’s ready, we’ll deliver your customised SWMS Template directly to your inbox.

We’ve packaged our experience and trade know-how into this nifty solution, aiming to assist you in creating a safer and more accountable workplace environment.


The Asphalt Milling Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards
    • Noise levels
  • 2. Equipment Inspection
    • Mechanical failure
    • Electric shocks
  • 3. Start of Milling Process
    • Flying debris
    • Dust inhalation
  • 4. Operation of Milling Machine
    • Crashes and Collisions
    • Fatigue
  • 5. Constant Monitoring
    • Falls from height
    • Lack of visibility
  • 6. Maintenance Activities
    • Proximity to moving parts
    • Chemical exposure
  • 7. Tool Changes
    • Hand injuries
    • Eye injuries
  • 8.Stop Milling Process
    • Unexpected machine start
    • Hot surfaces
  • 9.Clean Up
    • Slips on spilt material
    • Improper disposal
  • 10.Disassembly of Machine
    • Crush injuries
    • Pinch points
  • 11.Shut Down
    • Energy release
    • Burns
  • 12.Servicing
    • Fire risk
    • Hazardous waste disposal
  • 13.Reporting Hazards
    • Communication breakdowns
    • Incorrect information
  • 14.Evaluation of Work
    • Overexertion
    • Job dissatisfaction
  • 15.Process Review
    • Non-compliance
    • Process inefficiency
  • 16.Final Inspection
    • Missed defects
    • Complacency endangerment

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Asphalt Milling Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart