Introducing our Safe Work Method Statement (SWMS) Template for Asphalt Milling Machine! This thoughtfully-crafted product is streamlined to suit your workplace needs, particularly favouring tradespeople who require clarity and ease of use. Let’s take a look at its key features:
- Pre-filled and Comprehensive: Our SWMS template takes away the stress of figuring out where to start. It comes pre-filled with essential details you may need so that you can focus on adding specifics relevant to your project.
- Fully Editable and Customisable in Microsoft Word Format: Modify and personalise this document as much as you like – it’s yours. Our SWMS template is designed in a user-friendly Word format specially for easy editing to fit your project requirements.
- Includes the Scope of the Project and Project Details: Don’t sweat over missing or forgetting crucial project information. Our template ensures all pertinent details and project scope are well-documented.
- Includes a Checklist of Any High-Risk Machinery On Site: We understand the risk involved in operating high-risk machinery. Therefore, our SWMS template includes a robust, user-friendly checklist to keep you alert always.
- Includes Space for Recording Any Staff Training: Capturing who’s had what training is critical. Hence, we’ve devoted space for recording staff training sessions, promoting adherence to safety measures.
- Includes Before and After Risk Ratings: This embedded feature allows you to measure the efficacy of your safety efforts by comparing risk levels before and after implementation.
- Includes Resources for Use of Legislative References: Keeping abreast with statutory rules is necessary, so our template includes helpful resources for cross-checking relevant legislation.
- Includes All PPE Required: We’ve listed out essential Personal Protective Equipment (PPE) for you, ensuring everyone’s safety at the workplace.
- Includes Risk Assessment and Risk Assessment Matrix: Assess potential hazards concerning your asphalt milling machine operations with a handy risk assessment feature plus a matrix for visual clarity.
- Includes Checklist to Ensure All Requirements Have Been Covered: Streamline your work process without missing out any critical details using this convenient checklist.
- Includes Sign Off Page For All Workers And Responsible Persons: Accountability is vital. Therefore, our SWMS includes a sign-off page where all workers and responsible persons can confirm their comprehension and compliance with the safety processes discussed.
- Easy to Use, Easy To Customise: Designed for tradespeople like you to navigate and edit – let’s say we’ve made it ‘tradie-friendly’!
- Suitable for Large Contracts and Tenders, Including Tier 1 Contractual Work: This template is created to cater to all scales of operation; from big contracts to smaller projects – it tackles them all!
- Quick Delivery by Email: In a rush? No worries! Once it’s ready, we’ll deliver your customised SWMS Template directly to your inbox.
We’ve packaged our experience and trade know-how into this nifty solution, aiming to assist you in creating a safer and more accountable workplace environment.
The Asphalt Milling Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Trip hazards
- Noise levels
- 2. Equipment Inspection
- Mechanical failure
- Electric shocks
- 3. Start of Milling Process
- Flying debris
- Dust inhalation
- 4. Operation of Milling Machine
- Crashes and Collisions
- Fatigue
- 5. Constant Monitoring
- Falls from height
- Lack of visibility
- 6. Maintenance Activities
- Proximity to moving parts
- Chemical exposure
- 7. Tool Changes
- Hand injuries
- Eye injuries
- 8.Stop Milling Process
- Unexpected machine start
- Hot surfaces
- 9.Clean Up
- Slips on spilt material
- Improper disposal
- 10.Disassembly of Machine
- Crush injuries
- Pinch points
- 11.Shut Down
- Energy release
- Burns
- 12.Servicing
- Fire risk
- Hazardous waste disposal
- 13.Reporting Hazards
- Communication breakdowns
- Incorrect information
- 14.Evaluation of Work
- Overexertion
- Job dissatisfaction
- 15.Process Review
- Non-compliance
- Process inefficiency
- 16.Final Inspection
- Missed defects
- Complacency endangerment
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Asphalt Milling Machine Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


