Asbestos Exposure During Excavation Safe Work Method Statement (SWMS)

$96.80

The Asbestos Exposure During Excavation Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Asbestos Exposure During Excavation Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Asbestos Exposure During Excavation Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Asbestos Exposure During Excavation Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Asbestos Exposure During Excavation Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Asbestos Exposure During Excavation Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Asbestos Exposure During Excavation Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Asbestos dust exposure
    • trip hazards from equipment wires
  • 2. Site Assessment
    • Incorrect identification of asbestos
    • physical injuries from site debris
  • 3. Isolation
    • Asbestos dust spreading
    • physical strain from isolation barriers setup
  • 4. Asbestos Identification
    • Skin irritation from non-recognised asbestos form
    • inhalation of asbestos fibres
  • 5. Excavation Start
    • Asbestos material disturbance
    • accidental machinery operation
  • 6. Material Removal
    • Exposure to airborne asbestos during removal
    • drop hazards from heavy bags
  • 7. Decontamination
    • Inadequate decontamination
    • exposure to cleaning chemicals
  • 8. Material Disposal
    • Risks at authorised disposal facilities
    • cuts or punctures from sharp objects in waste
  • 9. Area Restriction
    • Unauthorised area entry
    • residual asbestos contamination
  • 10. Equipment Checks
    • Faulty
    • damaged
    • non-calibrated devices venting asbestos dust
  • 11. Breakdown of Enclosure
    • Unplanned release of asbestos fibres
    • collapse risks of enclosed area
  • 12. Health Surveillance
    • Risk of latent symptoms going unnoticed
    • personal data mismanagement
  • 13. Documentation
    • Misreporting of collected data
    • loss or mishandling of mandatory legal documents
  • 14. Final Inspection
    • Incomplete inspection leading to residual risk
    • missed documentation
  • 15. Work Area Return
    • Residual dust contamination
    • unreported asbestos materials
  • 16. Review Procedure
    • Inadequate adaptations to procedure
    • ignoring aspects of improved safety measures
  • 17. Training Sessions
    • Inadequate training leaving gaps in knowledge
    • overlooked individual needs
  • 18. Emergency Procedures
    • Unprepared for unexpected releases
    • inability to react properly during incidents
  • 19. Equipment Maintenance
    • Unexpected equipment faults leading to asbestos exposure
    • lacklustre maintenance checks
  • 20. Site Closure
    • Premature site closure leading to exposure
    • improper handling during closure

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Asbestos Exposure During Excavation Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart