BlueSafe

Air Conditioner Decommissioning SWMS

This SWMS covers planning and carrying out air conditioner decommissioning, from site review and isolation through to removal, waste management and handover.

Activities covered include

  • Review the work scope, site conditions and potential changes before starting.
  • Recover the refrigerant charge and manage cylinder handling and releases.
  • Transport equipment, cylinders and waste, then clean up and hand over the area.

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Acceptance guaranteed

If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Air Conditioner Decommissioning SWMS
  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
  • Customisable - Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Product Overview

This SWMS covers planning and carrying out air conditioner decommissioning, from site review and isolation through to removal, waste management and handover. It supports the identification and management of risks associated with electrical supplies, refrigerant, elevated access, lifting and the work area.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Review the work scope, site conditions and potential changes before starting.
  • Set up and secure the work area to manage access, occupants, vehicles, trips and falling objects.
  • Arrange and use elevated access for units located above ground level.
  • Inspect recovery equipment, cylinders, tools and hoses before use.
  • Isolate electrical supplies and manage unexpected energisation risks.
  • Recover the refrigerant charge and manage cylinder handling and releases.
  • Disconnect services and pipework while addressing residual pressure, sharp edges and spills.
  • Remove indoor and outdoor units, including lifting, stability and dropped-object risks.
  • Make openings, supports and exposed services safe after removal.
  • Transport equipment, cylinders and waste, then clean up and hand over the area.

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out air conditioner decommissioning activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Review scope and site conditions
  • Unidentified asbestos-containing material
  • Unexpected electrical supply
  • Refrigerant release
  • Falls from elevated units
  • Unauthorised scope changes
Establish work area
  • Public entry
  • Trips and slips
  • Vehicle interaction
  • Falling objects
  • Exposure to occupants
Set up elevated access
  • Fall from height
  • Platform collapse
  • Falling tools
  • EWP overturn
  • Contact with overhead services
Inspect equipment and cylinders
  • Recovery equipment failure
  • Cylinder rupture
  • Electrical shock from tools
  • Hose whip
  • Manual handling strain
Isolate electrical supplies
  • Electric shock
  • Arc flash
  • Unexpected start-up
  • Backfeed from controls
  • Damaged wiring
Recover refrigerant charge
  • Refrigerant release
  • Asphyxiation
  • Cold burns
  • Cylinder overpressure
  • Environmental contamination
  • Ignition of flammable refrigerant
Disconnect services and pipework
  • Residual refrigerant pressure
  • Sharp edges
  • Condensate spill
  • Electrical contact
  • Dust and mould exposure
Remove indoor unit
  • Unit falling
  • Manual handling strain
  • Sharp coil fins
  • Ceiling damage
  • Dust exposure
Remove outdoor condensing unit
  • Crush from suspended load
  • Fall from roof or balcony
  • Unit instability
  • Lifting gear failure
  • Dropped objects
  • Contact with structures
Make openings and supports safe
  • Water ingress
  • Sharp projections
  • Falling materials
  • Exposed electrical conductors
  • Unauthorised access
Transport and manage waste
  • Refrigerant cylinder movement
  • Hazardous waste release
  • Manual handling strain
  • Load shift
  • Vehicle collision
Clean up and hand over
  • Residual trip hazards
  • Uncontrolled re-energisation
  • Incomplete isolation
  • Environmental contamination
  • Unauthorised system use

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to identify hazards, eliminate or minimise risks so far as reasonably practicable, provide safe systems of work, consult workers, maintain plant, manage hazardous chemicals, provide PPE, and prepare and comply with a SWMS where high-risk construction work applies.
  • Applicable Commonwealth refrigerant and synthetic greenhouse gas controls, including requirements for authorised refrigerant handling, recovery, containment, labelling and lawful disposal of refrigerant.
  • Model Code of Practice: Construction Work — guidance on SWMS preparation, consultation and stopping work that is not being carried out in accordance with the SWMS.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace — guidance covering plant decommissioning, dismantling, energy isolation, inspection, maintenance and records.
  • Model Code of Practice: Managing the Risk of Falls at Workplaces — guidance for selecting and implementing fall-prevention controls.
  • Model Code of Practice: Managing Electrical Risks in the Workplace — guidance for electrical isolation, testing and safe electrical work.
  • Model Code of Practice: Hazardous Manual Tasks — guidance for eliminating or reducing musculoskeletal risks.
  • Model Code of Practice: How to Manage and Control Asbestos in the Workplace and How to Safely Remove Asbestos — inspect the asbestos register and stop work where asbestos-containing material may be disturbed; air-conditioner-related asbestos sheet removal is specifically addressed in the removal guidance.
  • AS/NZS 5149 series Refrigerating systems and heat pumps; AS/NZS 3000 Wiring Rules; AS/NZS 3012 Electrical installations—Construction and demolition sites; AS/NZS 1891 series Industrial fall-arrest systems and devices; AS 2550 series Cranes, hoists and winches—Safe use; AS 1418 series Cranes, hoists and winches; AS/NZS 1576 series Scaffolding; AS 1657 Fixed platforms, walkways, stairways and ladders; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionAir Conditioning and Refrigeration

Related templates

$79.50

$96.80

Save $17.30

One-time payment