Access High Risk Locations Safe Work Method Statement (SWMS)

$96.80

The Access High Risk Locations Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Access High Risk Locations Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Access High Risk Locations Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Access High Risk Locations Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Access High Risk Locations Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Access High Risk Locations Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Access High Risk Locations Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slippery floors
    • Incorrect use of equipment
  • 2. Equipment Check
    • Faulty equipment
    • Trips and falls due to clutter
  • 3. Accessing Site
    • Slips and falls
    • Traffic accidents
    • Encounters with wildlife
  • 4. Working at Height
    • Trips
    • falls from height
    • Dropping objects
  • 5. Using Tools
    • Inappropriate use of tools
    • Tool malfunctions
  • 6. Lifting Loads
    • Back injury
    • Falling loads
  • 7. Handling Chemicals
    • Skin irritation
    • Eye damage
    • Respiratory issues
  • 8. Electrical Work
    • Electrocution
    • Electrical fires
  • 9. Climbing Ladders
    • Falls from height
    • Ladder collapse
  • 10. Working in Confined Spaces
    • Lack of oxygen
    • Fire
    • Explosive atmospheres
  • 11. Ground Works
    • Cave-ins
    • Falling into trench
    • Striking underground services
  • 12. Working Near Water
    • Drowning
    • Slippery surfaces
  • 13. Night Work
    • Reduced visibility
    • Fatigue
    • Accidents due to increased activity of local fauna
  • 14. Weather Exposure
    • Heat exhaustion
    • Hypothermia
    • Lightning strike
  • 15. Cleaning Up
    • Slippery surfaces
    • Contact with chemicals
  • 16. Emergency Procedures
    • Panic
    • Injury during evacuation
  • 17. Reporting Incidents
    • Lack of communication
    • Inadequate follow-up
  • 18. Reviewing Procedures
    • Complacency
    • Overlooking hazards
  • 19. Training Workers
    • Inadequate training
    • Miscommunication
  • 20. Maintaining Equipment
    • Faulty equipment leading to accidents
    • Injury from sharp/rough surfaces

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Access High Risk Locations Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart