Working In Contaminated Water Safe Work Method Statement (SWMS)

$96.80

The Working In Contaminated Water Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Working In Contaminated Water Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working In Contaminated Water Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working In Contaminated Water Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working In Contaminated Water Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working In Contaminated Water Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working In Contaminated Water Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • skin exposure to contaminated water
  • 2. Site Assessment
    • Exposure to harmful microorganisms
    • accidental ingestion of contaminated water
  • 3. Personal Protective Equipment Fitting
    • Inadequate protection
    • allergic reactions
  • 4. Work Area Set up
    • Falling objects
    • electrocution from equipment
  • 5. Decontaminating Water
    • Chemical burns and splashes
    • gas inhalation
  • 6. Monitoring Contamination Levels
    • Exposure to harmful substances
    • eye injuries from equipment misuse
  • 7. Breaks and Rest Periods
    • Dehydration
    • fatigue leading to accidents
  • 8. Responding to Emergencies
    • Physical injury during evacuation
    • delayed response due to lack of training
  • 9. Handling Materials and Equipment
    • Back injuries from manual handling
    • burns from hot surfaces
  • 10. Clean up and Waste Disposal
    • Exposure to hazardous substances
    • cuts from sharp objects
  • 11. Debrief and Reporting
    • Miscommunication leading to potential future hazards
    • complacency due to routine
  • 12. Equipment Maintenance
    • Unexpected equipment failure
    • cuts from sharp edges
  • 13. Hygiene Practices
    • Spread of germs due to poor personal hygiene
    • disease due to contaminated water
  • 14. Storage and Control of Hazardous Chemicals
    • Fire hazard due to improper storage
    • chemical leaks leading to exposure
  • 15. Training and Inspection
    • Knowledge gaps leading to mishaps
    • overlooked equipment faults
  • 16. Health Monitoring
    • Delayed detection of health issues
    • prolonged exposure to hazards
  • 17. Document Control and Record Keeping
    • Loss or misuse of confidential data
    • non-compliance with standards due to mismanaged files
  • 18. Dissemination of Information
    • Confusion due to inadequate information distribution
    • non-compliance due to unawareness

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working In Contaminated Water Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart