
Working Near Overhead Power Lines (No Go Zones) Risk Assessment
- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content – Ready to Deploy Immediately
- Customisable – Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Two Ways to Get Started
Upload your logo and company details — we'll customise all your documents automatically.
Download the Word template and edit directly.
Product Overview
Identify and control organisational risks associated with Working Near Overhead Power Lines (No Go Zones) through a structured, management-level WHS Risk Management approach that supports planning, policy, training and engineering controls. This Risk Assessment helps demonstrate Due Diligence under the WHS Act, reducing organisational exposure to prosecution, enforceable undertakings and operational liability.
Risk Categories & Hazards Covered
This document assesses risks and outlines management controls for:
- Organisational WHS Governance & Legal Compliance: Assessment of executive due diligence, policies, procedures and verification processes relating to work near overhead power lines and No Go Zones.
- Planning, Design & Engineering of Work Near Power Lines: Management of design-stage decisions, engineering solutions, route selection and constructability reviews to eliminate or minimise electrical contact risks.
- Site Identification, Surveying & Services Location: Protocols for identifying overhead assets, confirming voltage and ownership, and integrating survey and Dial Before You Dig information into work planning.
- No Go Zone Rules, Procedures & Documentation: Development and control of documented No Go Zone rules, permits, authority-to-work systems and task-specific risk assessments for proximity to live conductors.
- Management of Contractors, Subcontractors & Utility Providers: Oversight of third-party engagement, prequalification, competency verification and coordination with electricity supply authorities and network providers.
- Plant, Equipment Selection & Engineering Controls: Assessment of suitability and compliance of EWP, cranes, excavators and other plant, including use of insulating devices, slew and height limiters, and physical barriers.
- Operator Competency, Licensing & Training: Verification of licences, high-risk work authorisations, refresher training and specific No Go Zone awareness for operators, spotters and supervisors.
- Site Induction, Communication & Information Sharing: Systems for site-specific inductions, communication of power line locations, voltage, safe approach distances and emergency procedures to all workers and visitors.
- Physical Separation, Exclusion Zones & Signage: Establishment and maintenance of compliant approach distances, barricades, flagging, warning signs and traffic management to prevent encroachment into No Go Zones.
- Spotters, Supervision & Work Monitoring: Requirements for trained safety observers, supervision levels, real-time monitoring of plant movements and enforcement of stop-work authority.
- Change Management, Non‑Routine & Emergency Work: Controls for variations, after-hours works, breakdown response and non-standard tasks that may alter risk profiles near overhead power lines.
- Environmental Conditions & Work Scheduling: Management of wind, rain, poor visibility, lightning, temperature and other environmental factors affecting electrical arcing, line sway and safe clearances.
- Emergency Preparedness, Response & Recovery: Planning for electrical contact or arcing incidents, including rescue procedures, isolation, first aid for electric shock and post-incident recovery and investigation.
- Inspection, Maintenance & Verification of Controls: Scheduled inspection of plant, insulating equipment, barriers and signage, plus audits and reviews to confirm that No Go Zone controls remain effective.
- Fatigue, Human Factors & Behavioural Safety: Consideration of fatigue, distraction, production pressure, risk perception and behavioural programs to support safe decision-making near power lines.
Who is this for?
This Risk Assessment is designed for Business Owners, Project Managers, Construction Managers and Safety Officers responsible for planning, approving and overseeing work near overhead power lines and No Go Zones.
Hazards & Risks Covered
| Hazard | Risk Description |
|---|---|
| 1. Organisational WHS Governance & Legal Compliance |
|
| 2. Planning, Design & Engineering of Work Near Power Lines |
|
| 3. Site Identification, Surveying & Services Location |
|
| 4. No Go Zone Rules, Procedures & Documentation |
|
| 5. Management of Contractors, Subcontractors & Utility Providers |
|
| 6. Plant, Equipment Selection & Engineering Controls |
|
| 7. Operator Competency, Licensing & Training |
|
| 8. Site Induction, Communication & Information Sharing |
|
| 9. Physical Separation, Exclusion Zones & Signage |
|
| 10. Spotters, Supervision & Work Monitoring |
|
| 11. Change Management, Non‑Routine & Emergency Work |
|
| 12. Environmental Conditions & Work Scheduling |
|
| 13. Emergency Preparedness, Response & Recovery |
|
| 14. Inspection, Maintenance & Verification of Controls |
|
| 15. Fatigue, Human Factors & Behavioural Safety |
|
Need to add specific hazards for your workplace?
Don't worry if a specific hazard isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom hazards at no extra cost. We take care of the hard work—creating the risk ratings and control measures for free—to ensure your document is compliant within minutes.
Legislation & References
This document was researched and developed to align with:
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2017
- Safe Work Australia – Managing Electrical Risks in the Workplace Code of Practice: Guidance on controlling electrical risks, including work near overhead power lines.
- Safe Work Australia – Construction Work Code of Practice: Requirements for planning and managing construction activities involving electrical hazards.
- Safe Work Australia – How to Manage Work Health and Safety Risks Code of Practice: Framework for identifying hazards, assessing risks and implementing controls.
- AS/NZS ISO 31000:2018: Risk management — Guidelines.
- AS/NZS 3000:2018 (Wiring Rules): Electrical installations — General principles and safety requirements relevant to electrical systems and interfaces.
- AS/NZS 4836:2011: Safe working on or near low-voltage electrical installations and equipment.
- AS 2550 Series: Cranes, hoists and winches — Safe use, including proximity to overhead electrical conductors.
- AS 1418 Series: Cranes, hoists and winches — Design, construction and testing requirements relevant to plant operating near power lines.
Standard Risk Assessment Features (Click to Expand)
- Comprehensive hazard identification for all activities
- Risk rating matrix with likelihood and consequence analysis
- Existing control measures evaluation
- Residual risk assessment after controls
- Hierarchy of controls recommendations
- Action priority rankings
- Review and monitoring requirements
- Consultation and communication records
- Legal compliance references
- Sign-off and approval sections
Suitable for Industries
$79.5
Includes all formats + 2 years updates

Working Near Overhead Power Lines (No Go Zones) Risk Assessment
- • 100% Compliant with Australian WHS Acts & Regulations
- • Fully Editable MS Word & PDF Formats Included
- • Pre-filled Content – Ready to Deploy Immediately
- • Customisable – Easily Add Your Logo & Site Details
- • Includes 2 Years of Free Compliance Updates
Working Near Overhead Power Lines (No Go Zones) Risk Assessment
Product Overview
Identify and control organisational risks associated with Working Near Overhead Power Lines (No Go Zones) through a structured, management-level WHS Risk Management approach that supports planning, policy, training and engineering controls. This Risk Assessment helps demonstrate Due Diligence under the WHS Act, reducing organisational exposure to prosecution, enforceable undertakings and operational liability.
Risk Categories & Hazards Covered
This document assesses risks and outlines management controls for:
- Organisational WHS Governance & Legal Compliance: Assessment of executive due diligence, policies, procedures and verification processes relating to work near overhead power lines and No Go Zones.
- Planning, Design & Engineering of Work Near Power Lines: Management of design-stage decisions, engineering solutions, route selection and constructability reviews to eliminate or minimise electrical contact risks.
- Site Identification, Surveying & Services Location: Protocols for identifying overhead assets, confirming voltage and ownership, and integrating survey and Dial Before You Dig information into work planning.
- No Go Zone Rules, Procedures & Documentation: Development and control of documented No Go Zone rules, permits, authority-to-work systems and task-specific risk assessments for proximity to live conductors.
- Management of Contractors, Subcontractors & Utility Providers: Oversight of third-party engagement, prequalification, competency verification and coordination with electricity supply authorities and network providers.
- Plant, Equipment Selection & Engineering Controls: Assessment of suitability and compliance of EWP, cranes, excavators and other plant, including use of insulating devices, slew and height limiters, and physical barriers.
- Operator Competency, Licensing & Training: Verification of licences, high-risk work authorisations, refresher training and specific No Go Zone awareness for operators, spotters and supervisors.
- Site Induction, Communication & Information Sharing: Systems for site-specific inductions, communication of power line locations, voltage, safe approach distances and emergency procedures to all workers and visitors.
- Physical Separation, Exclusion Zones & Signage: Establishment and maintenance of compliant approach distances, barricades, flagging, warning signs and traffic management to prevent encroachment into No Go Zones.
- Spotters, Supervision & Work Monitoring: Requirements for trained safety observers, supervision levels, real-time monitoring of plant movements and enforcement of stop-work authority.
- Change Management, Non‑Routine & Emergency Work: Controls for variations, after-hours works, breakdown response and non-standard tasks that may alter risk profiles near overhead power lines.
- Environmental Conditions & Work Scheduling: Management of wind, rain, poor visibility, lightning, temperature and other environmental factors affecting electrical arcing, line sway and safe clearances.
- Emergency Preparedness, Response & Recovery: Planning for electrical contact or arcing incidents, including rescue procedures, isolation, first aid for electric shock and post-incident recovery and investigation.
- Inspection, Maintenance & Verification of Controls: Scheduled inspection of plant, insulating equipment, barriers and signage, plus audits and reviews to confirm that No Go Zone controls remain effective.
- Fatigue, Human Factors & Behavioural Safety: Consideration of fatigue, distraction, production pressure, risk perception and behavioural programs to support safe decision-making near power lines.
Who is this for?
This Risk Assessment is designed for Business Owners, Project Managers, Construction Managers and Safety Officers responsible for planning, approving and overseeing work near overhead power lines and No Go Zones.
Hazards & Risks Covered
| Hazard | Risk Description |
|---|---|
| 1. Organisational WHS Governance & Legal Compliance |
|
| 2. Planning, Design & Engineering of Work Near Power Lines |
|
| 3. Site Identification, Surveying & Services Location |
|
| 4. No Go Zone Rules, Procedures & Documentation |
|
| 5. Management of Contractors, Subcontractors & Utility Providers |
|
| 6. Plant, Equipment Selection & Engineering Controls |
|
| 7. Operator Competency, Licensing & Training |
|
| 8. Site Induction, Communication & Information Sharing |
|
| 9. Physical Separation, Exclusion Zones & Signage |
|
| 10. Spotters, Supervision & Work Monitoring |
|
| 11. Change Management, Non‑Routine & Emergency Work |
|
| 12. Environmental Conditions & Work Scheduling |
|
| 13. Emergency Preparedness, Response & Recovery |
|
| 14. Inspection, Maintenance & Verification of Controls |
|
| 15. Fatigue, Human Factors & Behavioural Safety |
|
Need to add specific hazards for your workplace?
Don't worry if a specific hazard isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom hazards at no extra cost. We take care of the hard work—creating the risk ratings and control measures for free—to ensure your document is compliant within minutes.
Legislation & References
This document was researched and developed to align with:
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2017
- Safe Work Australia – Managing Electrical Risks in the Workplace Code of Practice: Guidance on controlling electrical risks, including work near overhead power lines.
- Safe Work Australia – Construction Work Code of Practice: Requirements for planning and managing construction activities involving electrical hazards.
- Safe Work Australia – How to Manage Work Health and Safety Risks Code of Practice: Framework for identifying hazards, assessing risks and implementing controls.
- AS/NZS ISO 31000:2018: Risk management — Guidelines.
- AS/NZS 3000:2018 (Wiring Rules): Electrical installations — General principles and safety requirements relevant to electrical systems and interfaces.
- AS/NZS 4836:2011: Safe working on or near low-voltage electrical installations and equipment.
- AS 2550 Series: Cranes, hoists and winches — Safe use, including proximity to overhead electrical conductors.
- AS 1418 Series: Cranes, hoists and winches — Design, construction and testing requirements relevant to plant operating near power lines.
Standard Risk Assessment Features (Click to Expand)
- Comprehensive hazard identification for all activities
- Risk rating matrix with likelihood and consequence analysis
- Existing control measures evaluation
- Residual risk assessment after controls
- Hierarchy of controls recommendations
- Action priority rankings
- Review and monitoring requirements
- Consultation and communication records
- Legal compliance references
- Sign-off and approval sections
$79.5