Explosives Safety SWMS

This SWMS covers planning, preparing, carrying out and closing out blasting work involving explosives.
Activities covered include
- Plan and authorise blasting work
- Prepare, load, stem and secure blast holes
- Remove blasted material and reconcile stock
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers planning, preparing, carrying out and closing out blasting work involving explosives. It supports hazard management for blast areas, explosives handling, drilling, firing, post-blast inspection and misfires.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan and authorise blasting work
- Inspect the site and blast area
- Receive and transport explosives
- Store explosives securely
- Establish blast exclusion zones
- Drill blast holes
- Prepare, load, stem and secure blast holes
- Clear people and plant before firing
- Initiate the controlled blast
- Inspect the area after blasting
- Manage misfires and anomalies
- Remove blasted material and reconcile stock
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out explosives and blasting activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Blast planning and authorisation |
|
| Inspect site and blast area |
|
| Receive and transport explosives |
|
| Store explosives securely |
|
| Establish blast exclusion zone |
|
| Drill blast holes |
|
| Prepare and load blast holes |
|
| Stem and secure blast holes |
|
| Clear area before firing |
|
| Initiate controlled blast |
|
| Inspect after blast |
|
| Manage misfires and anomalies |
|
| Remove blasted material |
|
| Reconcile stock and close out |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Applicable dangerous goods and explosives legislation in the state or territory where possession, storage, handling, transport, use and disposal occur.
- Model Code of Practice: Excavation Work — explosives use in construction is high risk construction work; a SWMS, licensed competent explosives user, authorised blast management plan and jurisdictional regulator notification may be required.
- Model Code of Practice: Managing the Risk of Falls at Workplaces.
- Model Code of Practice: Demolition Work, where explosives are proposed for demolition or structural collapse; obtain regulator approval where required.
- AS 2187.2, Explosives — Storage and use — Use of explosives.
- AS 2187.1, Explosives — Storage, transport and use — Storage.
- Australian Code for the Transport of Explosives by Road and Rail.
- Australian Dangerous Goods Code, where applicable to transport activities.
- AS 1742.3, Manual of uniform traffic control devices — Traffic control for works on roads.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates