General Working at Heights SWMS

This SWMS covers planning, carrying out and completing general work at heights, including access, platforms, fall protection and emergency response.
Activities covered include
- Plan height work and identify site hazards
- Install and check fall protection
- Demobilise height work and sign off
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers planning, carrying out and completing general work at heights, including access, platforms, fall protection and emergency response. It supports work planning and risk management by addressing height-related hazards throughout the task.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan height work and identify site hazards
- Set exclusion zones below overhead work
- Inspect access and fall-protection equipment
- Establish safe access and egress
- Use scaffold platforms
- Operate elevated platforms
- Install and check fall protection
- Inspect elevated structures and openings
- Carry out overhead installations
- Monitor weather conditions
- Respond to a fall emergency
- Demobilise height work and sign off
Who is this for?
For contractors, workers, supervisors and businesses carrying out general work at heights.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan height work |
|
| Set exclusion zones |
|
| Inspect access equipment |
|
| Establish safe access |
|
| Use scaffold platforms |
|
| Operate elevated platforms |
|
| Install fall protection |
|
| Inspect elevated structures |
|
| Perform overhead installations |
|
| Complete height tasks |
|
| Monitor weather conditions |
|
| Respond to fall emergency |
|
| Demobilise and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to eliminate or minimise risks so far as is reasonably practicable, provide safe plant and systems of work, consult affected workers, provide information, training, instruction and supervision, and manage risks associated with falls.
- Model Code of Practice: Managing the risk of falls at workplaces — guidance on performing work on the ground or solid construction first, then fall-prevention devices, work-positioning systems and fall-arrest systems; model guidance only and not automatically legally effective in every jurisdiction.
- Model Code of Practice: Construction work — guidance that construction work involving a risk of a person falling more than 2 m is high risk construction work and requires a SWMS before work starts; model guidance only and not automatically legally effective in every jurisdiction.
- Model Code of Practice: Elevating work platforms — guidance on EWP fall prevention, exclusion zones, platform gates and boom-type EWP harness use; model guidance only and not automatically legally effective in every jurisdiction.
- AS/NZS 1891 series Industrial fall-arrest systems and devices; AS/NZS 5532 Single point anchor device for harness-based work at heights; AS 1657 Fixed platforms, walkways, stairways and ladders; AS/NZS 4576 Guidelines for scaffolding; AS/NZS 1576 Scaffolding series; AS 2550.10 Cranes, hoists and winches—Safe use—Mobile elevating work platforms; AS 1892 Portable ladders series.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$49.50
Includes free branding + 2 years of free updates
$49.50
Free branding + 2 years of updates