General Electrical Installation, Wiring and Switchboards SWMS

General Electrical Installation, Wiring and Switchboards SWMS

  • -100% Compliant with Australian WHS Acts & Regulations
  • -Fully Editable MS Word & PDF Formats Included
  • -Pre-filled Content - Ready to Deploy Immediately
  • -Customisable - Easily Add Your Logo & Site Details
  • -Includes 2 Years of Free Compliance Updates

Download immediately

Your editable Word and PDF files are ready to download after purchase.

Product Overview

This SWMS covers general electrical installation, wiring and switchboard work from planning and isolation through installation, testing, commissioning and removal. It supports work planning and risk management for electrical supplies, access, wiring, equipment, energisation and handover.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan work, inspect the site and coordinate activities
  • Set up access and temporary power
  • Isolate supplies and prove equipment is de-energised
  • Position equipment and prepare tools
  • Install containment and cable routes
  • Pull and terminate wiring
  • Install bonding and earthing
  • Install switchboards and electrical equipment
  • Modify and repair installations
  • Conduct authorised energised testing
  • Verify and commission the system
  • Remove wiring, clean up and hand over

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out general electrical installation, wiring and switchboard activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan work and inspect site
  • Unidentified electrical supplies
  • Asbestos-containing materials
  • Unauthorised access
  • Poor work coordination
  • Manual handling strain
Set up access and temporary power
  • Electric shock from temporary supply
  • Damaged leads
  • Trips from cables
  • Falls from access equipment
  • Public contact
Isolate and prove de-energised
  • Electric shock
  • Arc flash
  • Unexpected energisation
  • Multiple supply back-feed
  • Stored electrical energy
Position equipment and prepare tools
  • Faulty test equipment
  • Tool contact with live parts
  • Manual handling injuries
  • Sharp edges
  • Arc-flash exposure
Install containment and cable routes
  • Contact with concealed wiring
  • Drilling into live cables
  • Silica and dust exposure
  • Falls from height
  • Cuts from tray edges
Pull and terminate wiring
  • Cable damage
  • Incorrect polarity
  • Electric shock
  • Repetitive strain
  • Fire from poor termination
Install bonding and earthing
  • Electric shock from ineffective earthing
  • Step and touch potential
  • Incorrect MEN connection
  • Lightning damage
  • Corrosion of earth connections
Install switchboards and equipment
  • Arc flash
  • Crush from equipment handling
  • Incorrect protection settings
  • Stored capacitor charge
  • Battery chemical exposure
Modify and repair installations
  • Hidden live conductors
  • Arc flash during fault finding
  • Overloaded circuits
  • Damaged machinery wiring
  • Wet-environment shock
Conduct authorised energised testing
  • Electric shock
  • Arc flash blast
  • Burns from exposed parts
  • Inadequate rescue response
  • Unexpected plant movement
Verify and commission system
  • Incorrect wiring polarity
  • Equipment malfunction
  • Unexpected energisation
  • Arc flash on energisation
  • Unauthorised operation
Demolish and remove wiring
  • Contact with live wiring
  • Asbestos disturbance
  • Falling cable debris
  • Sharp cable ends
  • Waste contamination
Clean up and hand over
  • Residual electrical hazards
  • Trips and sharp waste
  • Unauthorised reconnection
  • Incomplete documentation
  • Environmental contamination

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Managing electrical risks in the workplace — guidance for de-energised work, isolation, energised work, safety observers and electrical-risk controls.
  • Model Code of Practice: How to manage work health and safety risks — guidance on identifying hazards, applying the hierarchy of controls and reviewing controls.
  • Model Code of Practice: Construction work — guidance where the activity is high risk construction work and a SWMS is required.
  • AS/NZS 3000:2018 Electrical installations (Wiring Rules).
  • AS/NZS 4836:2023 Safe working on or near low-voltage and extra-low-voltage electrical installations and equipment.
  • AS/NZS 3012:2019 Electrical installations—Construction and demolition sites, including robust temporary switchboards and 30 mA RCD protection.
  • AS/NZS 3760:2022 In-service safety inspection and testing of electrical equipment and RCDs.
  • AS/NZS 3017 Electrical installations—Verification guidelines.
  • AS/NZS 61439 series Low-voltage switchgear and controlgear assemblies.
  • AS/NZS 1768 Lightning protection.
  • AS/NZS 5139 Electrical installations—Safety of battery systems for use with power conversion equipment.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionElectrical and Solar

Related templates

$79.50

$96.80

Save $17.30
Safe Work Australia Aligned