Engine and Driveline Repair SWMS
This SWMS covers engine and driveline repair, from preparing the work area and isolating vehicle energy sources through to testing, inspection and vehicle release.
Activities covered include
- Prepare the work bay and confirm parts, access and vehicle movement controls
- Dismantle, machine and repair gearbox and driveline components
- Complete road testing, inspection, cleanup and vehicle release
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers engine and driveline repair, from preparing the work area and isolating vehicle energy sources through to testing, inspection and vehicle release. It supports planning for vehicle movement, suspended loads, fluids, rotating parts, manual handling and other repair risks.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Prepare the work bay and confirm parts, access and vehicle movement controls
- Isolate vehicle energy sources before repair work
- Raise and support the vehicle for access
- Remove driveline components and manage fluids, torque and manual handling
- Remove engine and transmission assemblies using lifting equipment
- Dismantle, machine and repair gearbox and driveline components
- Repair fuel, cooling and exhaust system components
- Rebuild and install engine, transmission and coupling assemblies
- Conduct controlled system testing
- Complete road testing, inspection, cleanup and vehicle release
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out engine and driveline repair activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and prepare bay |
|
| Isolate vehicle energy sources |
|
| Raise and support vehicle |
|
| Remove driveline components |
|
| Remove engine transmission assemblies |
|
| Dismantle gearbox and driveline |
|
| Machine and repair components |
|
| Repair fuel cooling exhaust systems |
|
| Rebuild engine and transmission |
|
| Install assemblies and couplings |
|
| Conduct controlled system tests |
|
| Complete road test and inspection |
|
| Clean up and release vehicle |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: How to manage work health and safety risks.
- Model Code of Practice: Managing the risks of plant in the workplace (guidance only; check adoption in the relevant jurisdiction). The Code identifies plant repair, maintenance, guarding, authorised use, shutdown procedures and traffic controls as matters requiring practical safe-work procedures.
- Model Code of Practice: Hazardous manual tasks (guidance only; check adoption in the relevant jurisdiction).
- Model Code of Practice: Managing risks of hazardous chemicals in the workplace (guidance only; check adoption in the relevant jurisdiction).
- Model Code of Practice: Managing electrical risks in the workplace (guidance only; check adoption in the relevant jurisdiction). Training, instruction and competent supervision must match the electrical risks and work being performed.
- Model Code of Practice: Managing noise and preventing hearing loss at work (guidance only; check adoption in the relevant jurisdiction).
- Model Code of Practice: Welding processes (guidance only; check adoption in the relevant jurisdiction) for hot-work training, SDS access, PPE and emergency arrangements.
- AS/NZS 2550 series Cranes—Safe use; AS 1418 series Cranes, hoists and winches; AS 4991 Lifting devices; AS 1891 series Industrial fall-arrest systems where applicable.
- AS/NZS 3760 In-service safety inspection and testing of electrical equipment; AS/NZS 3012 Electrical installations—Construction and demolition sites where applicable; AS/NZS 60900 Live working—Hand tools for use up to 1,000 V AC.
- AS/NZS 1337.1 Eye and face protectors; AS/NZS 1270 Hearing protectors; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment; AS/NZS 2210.3 Safety footwear.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment