Heat Treatment Ovens and Injection Moulding SWMS
This SWMS covers work involving heat treatment ovens, conveyor oven lines, injection moulding, presses, sealers, die-casting, float glass and pressure treatment.
Activities covered include
- Complete pre-start planning and prepare the work area
- Conduct die-casting operations
- Clean down and sign off
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers work involving heat treatment ovens, conveyor oven lines, injection moulding, presses, sealers, die-casting, float glass and pressure treatment. It supports planning, operation, product handling, isolation, maintenance and clean-down while addressing heat, moving parts, crush, fume, glass and pressurised-release hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Complete pre-start planning and prepare the work area
- Inspect plant, guards and emergency stops
- Load materials safely
- Operate heat treatment ovens and conveyor oven lines
- Operate injection moulders
- Operate presses and sealers
- Conduct die-casting operations
- Demould and finish products
- Handle float glass
- Run pressure treatment activities
- Isolate and maintain plant
- Clean down and sign off
Who is this for?
For contractors, workers, supervisors and businesses carrying out the named heat treatment and production activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Set up work area |
|
| Inspect plant and guards |
|
| Load materials safely |
|
| Operate heat treatment ovens |
|
| Run conveyor oven lines |
|
| Operate injection moulder |
|
| Operate presses and sealers |
|
| Conduct die-casting operations |
|
| Demould and finish products |
|
| Handle float glass |
|
| Run pressure treatment |
|
| Isolate and maintain plant |
|
| Clean down and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: How to manage work health and safety risks (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Managing risks of plant in the workplace (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Managing risks of hazardous chemicals in the workplace (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Hazardous manual tasks (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Managing the work environment and facilities (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Managing noise and preventing hearing loss at work (guidance only; confirm adoption in the relevant jurisdiction).
- Model Code of Practice: Confined spaces (guidance only; confirm adoption in the relevant jurisdiction).
- AS 4024 series Safety of machinery; AS/NZS 3760 In-service safety inspection and testing of electrical equipment; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment; AS/NZS 1337.1 Eye and face protection; AS/NZS 1270 Hearing protectors; AS/NZS 2210.3 Safety footwear; AS/NZS 45001 Occupational health and safety management systems.
- AS 4343 Pressure equipment—Hazard levels; AS 3873 Pressure equipment—Operation and maintenance; AS 1210 Pressure vessels; AS 4041 Pressure piping; AS 4332 Storage and handling of gases in cylinders; AS/NZS 1596 Storage and handling of LP Gas, where applicable.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment