Product Overview

This SWMS covers planning, lifting, erecting, connecting and supporting precast tilt-up and structural concrete components. It supports planning and risk management for suspended loads, stability, falls, plant movement, concrete work and temporary supports.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the erection work and brief the work group
  • Set up site exclusions and access controls
  • Inspect foundations, anchors and set-out
  • Position cranes and other plant
  • Receive, stage, rig and test components before lifting
  • Erect columns, shafts and concrete panels
  • Install slabs and terrazzo units
  • Complete connections and grouting
  • Carry out slipform construction activities
  • Remove braces and supports, then clean up and sign off

Who is this for?

For contractors, workers, supervisors and businesses carrying out precast tilt-up and structural concrete work.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning and briefing
  • Unplanned erection sequence
  • Inadequate temporary stability
  • Conflicting trades
  • Fatigue and communication failure
Set up site exclusions
  • Unauthorised entry
  • Vehicle-pedestrian interaction
  • Overhead powerline contact
  • Uneven access surfaces
Inspect foundations and anchors
  • Anchor pull-out
  • Undermined footing
  • Incorrect set-out
  • Concrete edge failure
Position crane and plant
  • Crane overturning
  • Plant collision
  • Outrigger ground failure
  • Crush from counterweight
Receive and stage components
  • Load shift on transport
  • Falling precast units
  • Manual handling injuries
  • Damage to lifting inserts
Rig and test lift
  • Rigging gear failure
  • Incorrect lifting insert engagement
  • Crush from suspended load
  • Uncontrolled load rotation
Erect columns and shafts
  • Column instability
  • Lift-shaft collapse
  • Crush during alignment
  • Falls into shaft openings
Tilt up concrete panels
  • Panel collapse during rotation
  • Brace failure
  • Crush from panel movement
  • Wind loading on panel
Install slabs and terrazzo units
  • Slab drop or rotation
  • Falls through openings
  • Crush at bearings
  • Unstable partially completed floor
Complete connections and grouting
  • Falls from height
  • Welding fumes and fire
  • Cement burns
  • Silica dust exposure
Slipform construction
  • Formwork collapse
  • Entanglement in jacks
  • Concrete splash
  • Fall from platform
Remove braces and supports
  • Progressive collapse
  • Brace strike
  • Falls during release
  • Dropped connection hardware
Clean up and sign off
  • Residual instability
  • Silica dust
  • Plant interaction
  • Slips and trips

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Construction work (guidance only; confirm adoption and status in the relevant jurisdiction).
  • Model Code of Practice: How to manage work health and safety risks (guidance only).
  • Model Code of Practice: Managing the risks of plant in the workplace (guidance only).
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice (guidance only).
  • National Code of Practice for Precast, Tilt-up and Concrete Elements in Building Construction (technical guidance; confirm current jurisdictional requirements).
  • AS 3850 series Precast concrete elements in building construction.
  • AS 2550 series Cranes—Safe use; AS 1418 series Cranes, hoists and winches; AS 4991 Lifting devices.
  • AS/NZS 1891 series Industrial fall-arrest systems and devices; AS/NZS 5532 Manufacturing requirements for single-point anchor device used for harness-based work at heights.
  • AS/NZS 3012 Electrical installations—Construction and demolition sites.
  • AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices.
  • AS/NZS 1269 series Occupational noise management; AS/NZS 1270 Hearing protectors.
  • AS/NZS 1337 series Eye and face protection; AS/NZS 1801 Occupational protective helmets; AS/NZS 2210.3 Safety footwear; AS/NZS 4602.1 High visibility safety garments.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections