Post Hole Auger SWMS

This SWMS covers post-hole auger work from planning and service location through to drilling, post installation, clean-up and handover.
Activities covered include
- Review the scope, hole locations and work conditions
- Fuel, start and position the auger safely
- Install posts or supports, then clean up and demobilise
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers post-hole auger work from planning and service location through to drilling, post installation, clean-up and handover. It supports planning and risk management for rotating parts, kickback, underground services, dust, fuel and open holes.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the scope, hole locations and work conditions
- Locate underground services before drilling
- Establish a controlled work area
- Inspect the auger, leads and associated equipment
- Fuel, start and position the auger safely
- Drill post holes and manage kickback, dust and flying material
- Manage auger jams and stored energy
- Inspect completed holes and protect open holes
- Install posts or supports, then clean up and demobilise
Who is this for?
For contractors, workers, supervisors and businesses carrying out post-hole auger activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review scope and plan work |
|
| Locate underground services |
|
| Establish work area |
|
| Inspect auger and equipment |
|
| Fuel and start auger |
|
| Position operators and auger |
|
| Auger post holes |
|
| Manage auger jams |
|
| Inspect completed holes |
|
| Install posts and supports |
|
| Clean work area |
|
| Demobilise and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to manage risks, provide safe plant, maintain plant, provide information/training/supervision, consult workers, and manage excavation and underground essential-service risks.
- Model Code of Practice: How to manage work health and safety risks.
- Model Code of Practice: Managing the risks of plant in the workplace (November 2024), which applies the hierarchy of controls and requires plant to be fit for purpose, maintained and operated safely.
- Model Code of Practice: Excavation work (2020), including competent operation of plant, plant guarding, ground preparation, maintenance, traffic management and operator competence for excavation activities.
- Model Code of Practice: Construction work.
- Model Code of Practice: Managing risks of hazardous chemicals in the workplace.
- Electrical safety laws, service-owner requirements and applicable electrical safety guidance for work near overhead or underground electric lines; underground essential services include electricity, gas, water, sewerage, telecommunications, chemicals, fuel and refrigerant lines.
- AS/NZS 2210.3 Personal protective equipment—Safety footwear.
- AS/NZS 1270 Acoustics—Hearing protectors.
- AS/NZS 1337.1 Personal eye-protection.
- AS/NZS 1715 and AS/NZS 1716 Selection, use and maintenance of respiratory protective equipment.
- AS 1742.3 Manual of uniform traffic control devices—Traffic control for works on roads, where traffic controls are required.
- AS 2436 Guide to noise control on construction, maintenance and demolition sites.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates