Working in Wet Weather Rain and Thunderstorms SWMS

This SWMS covers work planning and site activities in wet weather, rain and thunderstorms.
Activities covered include
- Review weather conditions before starting
- Manage electrical equipment in wet conditions
- Complete emergency response, clean-up and sign-off
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers work planning and site activities in wet weather, rain and thunderstorms. It supports managing weather-related changes to access, equipment, visibility, electrical work and emergency response.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review weather conditions before starting
- Brief workers and confirm communication arrangements
- Set up safe access routes
- Inspect the work area for weather-related changes
- Check plant and vehicles
- Manage electrical equipment in wet conditions
- Carry out outdoor work in rain
- Stand down during thunderstorms when required
- Use devices and communications safely
- Inspect and restart work after weather events
- Complete emergency response, clean-up and sign-off
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out work in wet weather, rain or thunderstorms.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start weather review |
|
| Briefing and consultation |
|
| Set up access routes |
|
| Inspect work area |
|
| Check plant and vehicles |
|
| Manage electrical equipment |
|
| Outdoor work in rain |
|
| Thunderstorm stand-down |
|
| Use devices and communications |
|
| Restart after weather event |
|
| Emergency response and rescue |
|
| Clean-up and drainage |
|
| Demobilisation and sign-off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Work Health and Safety Act 2011 (Cth model), s19 primary duty of care, s28 duties of workers, s46 duty to consult
- Work Health and Safety Regulations 2011, r34-38 duty to identify hazards, manage risks, maintain and review controls
- Work Health and Safety Regulations 2011, r40 information, training and instruction
- Work Health and Safety Regulations 2011, r43 emergency plans
- Work Health and Safety Regulations 2011, r44-47 provision and use of personal protective equipment
- Work Health and Safety Regulations 2011, r78-80 remote or isolated work and emergency communication where applicable
- Work Health and Safety Regulations 2011, r208 powered mobile plant specific control measures
- Work Health and Safety Regulations 2011, r213-214 electrical risks and inspection/testing of electrical equipment
- Work Health and Safety Regulations 2011, r291 falls from one level to another
- Work Health and Safety Regulations 2011, r299 high risk construction work, r300 safe work method statement
- Code of Practice: How to Manage Work Health and Safety Risks
- Code of Practice: Construction Work
- Code of Practice: Managing the Risk of Falls at Workplaces
- AS/NZS 2210.3 Occupational protective footwear
- AS/NZS 4602.1 High visibility safety garments
- AS/NZS 1801 Occupational protective helmets
- AS/NZS 1270 Acoustics - hearing protectors
- AS/NZS 3012 Electrical installations - construction and demolition sites
- AS/NZS 3760 In-service safety inspection and testing of electrical equipment
- AS 1657 Fixed platforms, walkways, stairways and ladders
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates