Explosive Power Tools Gas and Pneumatic Nail Guns SWMS
This SWMS covers the set-up, operation, isolation and storage of gas and pneumatic nail guns.
Activities covered include
- Review the work scope and area
- Load and connect the nail gun
- Isolate, clean, inspect and store equipment
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers the set-up, operation, isolation and storage of gas and pneumatic nail guns. It supports planning for exclusion zones, tool and hose checks, fastening work, work at height, misfires, fatigue and clean-up.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Review the work scope and area
- Set exclusion zones and manage access
- Inspect nail guns and accessories
- Position compressors and hoses
- Handle gas cells and loads
- Prepare the workpiece and working posture
- Load and connect the nail gun
- Drive nails and staples
- Carry out nail-gun work at height
- Clear jams and misfires
- Manage noise and fatigue
- Isolate, clean, inspect and store equipment
Who is this for?
Suitable for contractors, workers, supervisors and businesses using gas or pneumatic nail guns.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Review scope and work area |
|
| Set exclusion zones and access |
|
| Inspect tools and accessories |
|
| Position compressor and hoses |
|
| Handle gas cells and loads |
|
| Prepare workpiece and posture |
|
| Load and connect tool |
|
| Drive nails and staples |
|
| Operate at height safely |
|
| Clear jams and misfires |
|
| Manage noise and fatigue |
|
| Isolate and clean work area |
|
| Inspect, store and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: How to Manage Work Health and Safety Risks (2024) — apply the hierarchy of controls and review controls when conditions change.
- Model Code of Practice: Hazardous Manual Tasks (2018) — nail-gun recoil, high grip force, awkward posture and prolonged tool use can create musculoskeletal risk.
- Managing Noise and Preventing Hearing Loss at Work Code of Practice — noisy powered tools, pneumatic impact tools and explosive-powered tools require noise-risk assessment and control.
- Model Code of Practice: Managing the Risk of Falls at Workplaces — apply where nail-gun work is undertaken at height.
- AS/NZS 1337.1 Eye and face protection for occupational applications; AS/NZS 1270 Acoustics—hearing protectors; AS/NZS 2210.3 Safety footwear; AS/NZS 1801 Occupational protective helmets; AS/NZS 1716 Respiratory protective devices; AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
- AS/NZS 3788 Pressure equipment—In-service inspection; ISO 4414 Pneumatic fluid power—General rules and safety requirements for systems and components.
- Follow the current manufacturer operating manual, maintenance instructions and compatible fastener/load schedule for each tool; model Codes and standards are guidance unless adopted or otherwise made applicable in the relevant jurisdiction or contract.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment