Metal Cnc Plasma Cutting Machine Safe Work Method Statement (SWMS)

$96.80

The Metal Cnc Plasma Cutting Machine Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Metal Cnc Plasma Cutting Machine Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Delve into the Safe Work Method Statement Template for Metal CNC Plasma Cutting Machine, thoughtfully designed with Australian workplaces in mind. This detailed yet straightforward template is piled high with useful features that support a healthy and safe work environment:

Pre-filled and Comprehensive: To save time and ensure nothing slips through the cracks, this template comes robustly pre-filled. With the core essentials already in place, you can simply layer on your specifics.

Fully Editable and Customisable: Modifying the template to perfectly suit your needs is a breeze, as its Word format offers peak flexibility! Forget about complicated editing – modify it fast to fit your project effortlessly.

Scope of the Project and Project Details: Provide around-the-clock clarity for all stakeholders by documenting project details and scope within this incorporated section.

High-Risk Machinery Checklist: Shed light on potential dangers with the High-Risk Machinery checklist. Track the presence and condition of potentially dangerous hardware found on site.

Staff Training Recordkeeping: Keep training records tidy with space to note down any performed personnel upskilling. Elevate workforce competence, one entry at a time!

Risk Ratings (Before & After): The ability to juxtapose pre-mitigation and post-mitigation risk ratings drives awareness of hazards and puts safety improvements into perspective.

Legislative References Resources: Know your obligations inside and out using easy-to-access resources for legislative references. Ignorance isn’t bliss when it comes to safety law compliance!

PPE Requirements List: This vital listing eliminates guesswork about mandatory personal protective equipment (PPE), ensuring workers are appropriately geared up for safety.

Risk Assessment & Matrix: Anticipate pitfalls and take action with the included Risk Assessment and Risk Matrix. Determine potential damages, their likelihoods and suitable mitigations against them.

All-Inclusive Requirements Checklist: Keep it foolproof with the SWMS checklist that ensures you meet all requirements when rolling out the safe work method statement.

Sign-Off Page: Document accountability with a dedicated sign-off area for all workers and responsible parties. This adds an added layer of security, knowing everyone is in the loop.

User-Friendly Customisation: You don’t need advanced tech skills to keep up with our SWMS template! Its user-friendly design promotes ease of use and seamless customisation.

Suitable for Large Contracts & Tenders: Pack a professional punch in significant negotiations, as this template exudes serious contractual proficiency for your Tier 1 contractual work.

Swift Email Delivery: Get your hands on the template quick smart via immediate email delivery. Get started sans delay!


The Metal Cnc Plasma Cutting Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect Equipment Setup
    • Insufficient PPE
  • 2. Machine Setup
    • Electric Shock
    • Crushing Hazard
  • 3. Material Loading
    • Manual Handling Injuries
    • Slips and Trips
  • 4. Preoperation Checks
    • Machine faults
    • Inadequate guarding
  • 5. Operation Beginning
    • Fire/Explosion
    • Excessive noise
  • 6. Regular Checks
    • Mechanical failure
    • Exposure to fumes
  • 7. Unloading Product
    • Foot Injury
    • Excessive lifting
  • 8. Material Waste Disposal
    • Hand Injuries
    • Eye injury
  • 9. Machine Maintenance
    • Electrical hazards
    • Chemical spills
  • 10. Shutdown Process
    • Burn risks
    • Eye damage from sparks
  • 11. Cleaning Equipment
    • Chemical exposure
    • Slips and trips
  • 12. Emergency Procedure Training
    • Ignorance of evacuation procedures
    • Lack of PPE
  • 13. Safety Briefings
    • Insufficient knowledge
    • Negligence
  • 14. Insurance Cover Evaluation
    • Uncovered medical costs
    • Workplace liabilities
  • 15. Periodic Equipment Upgrade
    • Old inefficient machine
    • Increased accident risk

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Metal Cnc Plasma Cutting Machine Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart