Pre-filled and Comprehensive: Our Safe Work Method Statement Template for Metal Chamfering Machine comes with all relevant fields meticulously filled in. This allows you to use a complete document that saves your time while ensuring you don’t miss out on any important aspect.
Fully Editable and Customisable in Microsoft Word Format: The template is in an easy-to-edit Word format, enabling you to customise and tailor it speedily according to your operational requirements and specific project details.
Includes the Scope of the Project and the Project Details: It offers detailed spaces for outlining the scope of your project and other specific details. This ensures comprehensive documentation and better understanding for all involved.
Incorporates Checklist of Any High-Risk Machinery on Site: Included in the document is an exhaustive checklist for high-risk machinery, providing a useful tool to assist in preventing workplace injuries and mishaps by identifying potential hazards.
Incorporates Space for Recording Any Staff Training: The template features dedicated areas for recording all staff training sessions, helping track employee competence levels and promoting a safer workplace through continuous education.
Includes Before and After Risk Ratings: The SWMS Template demonstrates risk ratings before and after the implementation of control measures. This supports better decision-making processes regarding safety precautions and strategies in your workplace.
Legislative References: Offering valuable resources relating to legislative references, you’ll always have at hand the most current safety standards and legal frameworks applicable to your industry.
Specifies All PPE Required: It also expounds on all personal protective equipment (PPE) required for operating the metal chamfering machine, thus averting health risks and enhancing overall safety in your work environment.
Risk Assessment and Risk Assessment Matrix: The template delivers a detailed risk assessment and an analytical risk assessment matrix, thereby providing transparent, informed insights on potential hazards and their severity.
Includes a Checklist: It comes with a useful checklist to ensure that all safety requirements associated with the SWMS have been met before commencing your project.
Incorporates Sign Off Page for All Workers and Responsible Persons: For increased accountability and documentation, our SWMS Template includes a sign-off page ensuring all workers and responsible persons acknowledge understanding and willingness to comply with safety measures.
Easy to Use, Easy to Customise: With intuitive design features, our Template is both easy to use and customise, thus aiding those even with minimal technical knowledge to swiftly tailor it according to their unique needs.
Suitable for Large Contracts and Tenders: Due to its comprehensive nature, the template is suitable for large contracts, tenders, and even Tier 1 contractual work, providing you with a convenient tool within budget while keeping high-quality standards.
Quick Delivery by Email: To cater to your time-sensitive requirements, we ensure quick delivery of our SWMS Template directly to your inbox immediately after purchase.
The Metal Chamfering Machine Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Trip hazards
- Incorrect use of equipment
- 2. Machine set-up
- Improper handling of machines
- electric shock
- 3. Performing chamfering
- Exposure to noise
- Inhalation of metal dust
- 4. Measurement and inspection
- Inadequate lighting
- erroneous measurements
- 5. Tool changeover
- Incorrect tool fitting
- severe cuts
- 6. Routine maintenance
- Electric shock
- burns from hot surfaces
- 7. Defective parts replacement
- Cuts and lacerations
- incorrect installation
- 8. Material feeding
- Hand injuries
- lifting heavy objects
- 9. Operation monitoring
- Poor posture
- prolonged standing
- 10. Final checking and approval
- Incorrect labelling
- overlooking defects
- 11. Machine shut down
- Inadvertent machine start
- electric shock
- 12. Storage and transportation
- Faulty storage causing damage
- manual handling issues
- 13. Emergency procedures
- Panic during emergencies
- lack of training
- 14. Waste Management
- Inappropriate disposal resulting in pollution
- injuries from sharp objects
- 15. Reporting and documentation
- Data privacy breaches
- inaccurate data logging
- 16. Regular intrusive tests
- Exposure to radiation
- wrong interpretation of results
- 17. Pre-start safety briefings
- Insufficient knowledge about risks
- non-adherence to safety rules
- 18. Audits and Reviews
- Overlooking of minor non-compliances
- inadequate audit process
- 19. Team meetings
- Interpersonal conflicts
- stress from work overload
- 20. End-of-day clean up
- Exposure to cleaning chemicals
- slips and falls
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Metal Chamfering Machine Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.


