Forestry Operations SWMS

This SWMS covers forestry operations from planning, access and plant setup through to harvesting, log handling, timber processing, refuelling and sign-off.
Activities covered include
- Plan forestry work, site access and emergency arrangements
- Carry out helicopter logging or high-altitude seed collection where required
- Refuel, manage fire risks, clean up and sign off
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers forestry operations from planning, access and plant setup through to harvesting, log handling, timber processing, refuelling and sign-off. It supports planning and risk management by addressing plant movement, falling timber, loading, cutting, dust, fire, remote-work and traffic hazards.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan forestry work, site access and emergency arrangements
- Establish access routes and traffic controls
- Position, inspect and maintain plant
- Program and operate tree-felling machinery
- Extract, snig and handle logs at the landing
- Carry out helicopter logging or high-altitude seed collection where required
- Inspect and prepare logs for processing
- Load, transport and stack logs
- Operate debarkers and sawmill breakdown equipment
- Mill and finish timber while managing dust and material handling
- Refuel, manage fire risks, clean up and sign off
Who is this for?
For contractors, workers, supervisors and businesses involved in forestry operations.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan forestry operations |
|
| Establish access and traffic |
|
| Position and inspect plant |
|
| Program auto felling machines |
|
| Extract and snig logs |
|
| Handle logs at landing |
|
| Conduct helicopter logging |
|
| Collect high-altitude seed |
|
| Inspect and prepare logs |
|
| Maintain tree harvesters |
|
| Load and transport logs |
|
| Operate debarkers |
|
| Operate sawmill breakdown |
|
| Mill and finish timber |
|
| Refuel and manage fire |
|
| Clean up and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Safety in forest harvesting operations, as adopted or approved in the relevant jurisdiction; it provides practical guidance for harvesting, extraction, loading, transport and road or landing work.
- Model Code of Practice: How to manage work health and safety risks.
- Model Code of Practice: Managing the risks of plant in the workplace; use guarding, isolation, maintenance and authorised-use controls for plant.
- Model Code of Practice: Managing the risk of falls at workplaces.
- Model Code of Practice: Managing noise and preventing hearing loss at work.
- Model Code of Practice: Hazardous manual tasks.
- Model Code of Practice: Managing the work environment and facilities.
- Model Code of Practice: First aid in the workplace.
- Model Code of Practice: Work health and safety consultation, cooperation and coordination.
- AS 2727:1997 Chainsaws—Guide to safe working practices.
- AS/NZS 4024 series Safety of machinery.
- AS/NZS 1891.4 Personal equipment for work at height—Selection, use and maintenance.
- AS/NZS 1270 Acoustics—Hearing protectors.
- AS/NZS 1801 Occupational protective helmets.
- AS/NZS 2210.3 Personal protective equipment—Safety footwear.
- AS/NZS 4602.1 High visibility safety garments.
- AS/NZS 1337.1 Personal eye-protection.
- AS/NZS 2161.1 Occupational protective gloves.
- Applicable civil aviation, dangerous goods, environmental, land-management and fire-control requirements for the jurisdiction and operation.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates