Plant Maintenance Repair and Commissioning SWMS

Plant Maintenance Repair and Commissioning SWMS

This SWMS covers plant maintenance, repair and commissioning from planning, isolation and fault diagnosis through to repair, reassembly, testing and handover.

Activities covered include

  • Plan the work, inspect the site and control access around plant
  • Repair or replace components and manage hand injuries, tool failure, leaks and oils
  • Commission the plant, then complete handover and close-out
  • Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
Instant download after purchase

Free company branding

Your logo, ABN and business details added at no extra cost.

2 years of free updates

Compliance updates included for two years, with updated documents available in your portal.

Acceptance guaranteed

Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.

Product Overview

This SWMS covers plant maintenance, repair and commissioning from planning, isolation and fault diagnosis through to repair, reassembly, testing and handover. It supports planning work steps and managing hazards from stored energy, moving parts, electrical exposure, fluids, lifting and unexpected movement.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan the work, inspect the site and control access around plant
  • Position plant and equipment with attention to movement, collision and stability risks
  • Isolate and lock out plant before maintenance work
  • Access guarded machinery and manage moving parts, sharp edges and crush points
  • Inspect faults and diagnose issues while managing energy, electrical and fluid hazards
  • Remove components and rollers using appropriate controls for loads, tension and pinch points
  • Repair or replace components and manage hand injuries, tool failure, leaks and oils
  • Grease and lubricate plant while controlling pressure, spills and moving-part hazards
  • Install guards and safety systems and check their intended function
  • Clean machinery and the work area, including debris and chemical hazards
  • Reassemble plant and verify components, guarding and pressure-related conditions
  • Commission the plant, then complete handover and close-out

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out plant maintenance, repair and commissioning activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan work and inspect site
  • Unplanned plant movement
  • Incorrect work scope
  • Unauthorised access
  • Mobile plant interaction
  • Poor access conditions
  • Inadequate competency
Position plant and equipment
  • Plant roll-over
  • Vehicle collision
  • Crush from moving plant
  • Dropped tools
  • Slips and trips
  • Manual handling strain
Isolate and lock out plant
  • Unexpected start-up
  • Electrical shock
  • Hydraulic release
  • Pneumatic release
  • Stored mechanical energy
  • Gravity movement
Access guarded machinery
  • Entanglement in moving parts
  • Cutting from sharp edges
  • Crush points
  • Unexpected restart
  • Fall from access point
  • Exposure to hot surfaces
Inspect faults and diagnose
  • Unexpected energy release
  • Electrical exposure
  • Hot fluids
  • Flying debris
  • Incorrect diagnosis
  • Exposure to noise
Remove components and rollers
  • Crush from falling components
  • Suspended load
  • Stored tension
  • Pinch points
  • Manual handling strain
  • Sharp edges
Repair and replace components
  • Incorrect parts installation
  • Hand injuries
  • Tool failure
  • Hydraulic leaks
  • Exposure to oils
  • Ergonomic strain
Grease and lubricate plant
  • High-pressure grease injection
  • Contact with moving parts
  • Slip from spilled lubricant
  • Chemical exposure
  • Unexpected plant movement
  • Fire from lubricant contamination
Install guards and safety systems
  • Access to dangerous parts
  • Guard failure
  • Interlock bypass
  • Unexpected start-up
  • Incorrect safety function
  • Sharp guard edges
Clean machinery and work area
  • Chemical exposure
  • Fire from combustible debris
  • Slip hazards
  • Cuts from debris
  • Compressed-air injury
  • Unplanned movement
Reassemble and verify plant
  • Missing components
  • Incorrect assembly
  • Dropped tools
  • Guarding defects
  • Leakage under pressure
  • Unauthorised energisation
Commission plant safely
  • Unexpected movement
  • Electrical shock
  • Crush from moving parts
  • Ejected components
  • Noise exposure
  • Control-system failure
Handover and close out
  • Undetected defects
  • Unauthorised use
  • Incomplete records
  • Residual hazards
  • Housekeeping hazards
  • Premature return to service

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
  • Model Code of Practice: Managing the Risks of Plant in the Workplace (2021) — guidance on plant risk management, information, training, inspection, maintenance, guarding, isolation, commissioning and registration.
  • Model Code of Practice: How to Manage Work Health and Safety Risks — guidance on consultation, risk assessment, hierarchy of controls and review of controls.
  • Model Code of Practice: Managing Electrical Risks in the Workplace — guidance on safe isolation, testing for de-energisation and preventing inadvertent re-energisation.
  • Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace — guidance on SDS review, chemical risk assessment, storage, handling and emergency arrangements.
  • AS 4024 series Safety of machinery — guarding, interlocks, safety-related control systems and risk reduction.
  • AS/NZS 4836 Safe working on or near low-voltage electrical installations and equipment.
  • AS/NZS 3760 In-service safety inspection and testing of electrical equipment.
  • AS/NZS 1891 series Industrial fall-arrest systems and devices.
  • AS 2550 series Cranes, hoists and winches — safe use.
  • AS 1418 series Cranes, hoists and winches — design and construction.
  • AS/NZS 3012 Electrical installations — construction and demolition sites, where applicable.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Transport and LogisticsManufacturing and ProductionWarehousing and DistributionMining and Resources

Related templates

$79.50

$96.80

Save $17.30

Free branding + 2 years of updates