General Plumbing Repairs Safe Work Method Statement (SWMS)

$96.80

The General Plumbing Repairs Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the General Plumbing Repairs Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

Safe Work Method Statement Template for General Plumbing Repairs

If you’re in the business of plumbing repairs and need a reliable Safe Work Method Statement (SWMS) template that’s straightforward yet thorough, you’ve landed in the right spot. This SWMS template aims to support your safety management, no matter how big or small the job. Let’s dive into its many features:

  • Pre-filled and Comprehensive: Our template comes readily filled with industry-standard procedures specific to general plumbing tasks. We’ve covered a broad range of scenarios to give you a solid starting point, saving you time and effort.
  • Fully Editable and Customisable: Offered in Microsoft Word format, this SWMS is easy to tweak according to your particular project’s needs. Whether it’s adding in particular safety protocols or including site-specific details, customising has never been simpler.
  • Includes the Scope of the Project and the Project Details: There’s room to lay out what the project covers, ensuring everyone knows what’s what from the get-go. Clarity goes a long way in keeping operations smooth and focused.
  • Includes Checklist of Any High-Risk Machinery on Site: Safety is paramount, so we’ve added a section where you can list any machinery that will be used. Verifying this checklist keeps high-risk equipment under check.
  • Includes Space for Recording Any Staff Training: Documenting training sessions? No worries! A dedicated space allows you to jot down who has done what training to ensure everyone’s up to scratch.
  • Includes Before and After Risk Ratings: Understanding risk levels before and after implementing control measures gives you valuable insights. This feature supports proactive rather than reactive management.
  • Includes Resources for Use of Legislative References: Stay informed with resources linked to legislative standards. Access these references to help ensure compliance with current workplace laws.
  • Includes All PPE Required: There’s a handy checklist outlining essential Personal Protective Equipment necessary for plumbing repairs. Proper gear is key, and now it’s all mapped out for you.
  • Includes Risk Assessment and Risk Assessment Matrix: You’ll find a structured risk assessment section and matrix where hazards and risks are evaluated systematically. Such assessments are invaluable in pre-empting potential issues on-site.
  • Includes a Checklist to Ensure All Requirements Have Been Covered: No stone left unturned—a final checklist helps make sure that all SWMS components are in place. Think of it as a last-minute assurance before work begins.
  • Includes Sign Off Page for All Workers and Responsible Persons: Accountability matters, and a sign-off page ensures everyone acknowledges their understanding and commitment to the safety measures outlined in the SWMS.
  • Easy to Use, Easy to Customise: From small businesses to those tackling tier 1 contractual jobs, this template makes managing compliance less hassle. It’s functional yet flexible.
  • Suitable for Large Contracts and Tenders: Designed with scalability in mind, this SWMS is suitable even for larger, more complex contracts, making it a versatile choice for diverse projects.
  • Quick Delivery by Email: Your time is precious. Once you decide, we’re quick to send you the document via email, so you can start focusing on what matters—carrying out your work safely and efficiently.

Our Safe Work Method Statement Template seeks to bolster, not guarantee, your efforts in maintaining a safe working environment. With all its accessible features, it acts as a supportive tool for safety-conscious tradies navigating the complexities of compliance and operational duties.

“`


The General Plumbing Repairs Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slip and trip
    • poor lighting
  • 2. Site Assessment
    • Fall hazards
    • unknown utility lines
  • 3. Tool Selection
    • Wrong tools
    • defective equipment
  • 4. PPE Check
    • Missing PPE
    • improper fit
  • 5. Shut-Off Water
    • Slip hazard
    • high pressure
  • 6. Drain System
    • Chemical exposure
    • biohazard
  • 7. Pipe Inspection
    • Sharp edges
    • confined spaces
  • 8. Remove Blockages
    • Chemical exposure
    • ergonomic strain
  • 9. Cut/Join Pipes
    • Flying debris
    • burns
  • 10. Install Fixtures
    • Heavy lifting
    • awkward postures
  • 11. Apply Sealants
    • Chemical exposure
    • inhalation risk
  • 12. Pressure Test
    • Explosion risk
    • high pressure leaks
  • 13. Electrical Work
    • Electric shock
    • arc flash
  • 14. Insulation Check
    • Asbestos exposure
    • respiratory issues
  • 15. Restore Water
    • Water hammer
    • leak
  • 16. Clean Work Area
    • Slip and trip
    • waste disposal
  • 17. Final Inspection
    • Equipment failure
    • oversight
  • 18. Documentation
    • Incomplete records
    • data loss
  • 19. De-mobilisation
    • Traffic hazards
    • rush activities
  • 20. Feedback Session
    • Miscommunication
    • lack of engagement
  • 21. Training Review
    • Outdated practices
    • non-compliance

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The General Plumbing Repairs Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart