BlueSafe

Vehicle Inspections and Pre-Start Checks SWMS

Vehicle Inspections and Pre-Start Checks SWMS

This SWMS covers vehicle inspections and pre-start checks from planning the inspection area through vehicle checks, defect reporting, travel and post-trip inspection.

Activities covered include

  • Plan a suitable vehicle inspection area
  • Test driving controls
  • Complete a post-trip inspection
  • Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content - Ready to Deploy Immediately
Instant download after purchase

Free company branding

Your logo, ABN and business details added at no extra cost.

2 years of free updates

Compliance updates included for two years, with updated documents available in your portal.

Acceptance guaranteed

Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.

Product Overview

This SWMS covers vehicle inspections and pre-start checks from planning the inspection area through vehicle checks, defect reporting, travel and post-trip inspection. It supports planning and risk management for vehicle movement, defects, pedestrian interaction, load condition, fatigue and changing road conditions.

Activities & Specific Tasks Covered

This document includes task-specific risk controls for:

  • Plan a suitable vehicle inspection area
  • Confirm vehicle authorisation and intended use
  • Conduct an exterior walk-around
  • Inspect the engine compartment
  • Enter the cab safely and check cabin condition
  • Check dashboard instruments, lights and warning systems
  • Test driving controls
  • Complete the pre-departure checklist
  • Document vehicle damage and defects
  • Depart and enter traffic with relevant checks completed
  • Conduct journey safety checks
  • Complete a post-trip inspection

Who is this for?

Suitable for contractors, workers, supervisors and businesses carrying out vehicle inspections and pre-start checks.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Plan inspection area
  • Vehicle movement
  • Pedestrian strike
  • Poor visibility
  • Uneven ground
Confirm vehicle authorisation
  • Unlicensed operation
  • Unsuitable vehicle use
  • Overloading
  • Unfamiliar controls
Conduct exterior walk-around
  • Tyre failure
  • Fluid leak
  • Sharp edges
  • Vehicle roll-away
  • Slip hazard
Inspect engine compartment
  • Hot surfaces
  • Moving engine parts
  • Battery electrolyte
  • Fuel leak
  • Manual handling strain
Enter cab safely
  • Slip from step
  • Fall from cab
  • Cabin clutter
  • Manual handling strain
Check dash instruments
  • Loss of braking
  • Engine failure
  • Warning system failure
  • Distraction
Test lights and warnings
  • Pedestrian strike
  • Rear-end collision
  • Electrical fault
  • Vehicle movement
Test driving controls
  • Brake failure
  • Steering failure
  • Unintended movement
  • Collision with pedestrians
  • Plant interaction
Complete pre-departure checklist
  • Undetected defect
  • Inadequate emergency equipment
  • Fatigue impairment
  • Unsecured load
Document damage and defects
  • Continued use of unsafe vehicle
  • Incomplete maintenance records
  • Defect escalation failure
  • Conflict after damage
Depart and enter traffic
  • Vehicle-pedestrian collision
  • Reversing strike
  • Traffic collision
  • Load shift
  • Driver distraction
Conduct journey safety checks
  • Tyre overheating
  • Load movement
  • Fatigue
  • Mechanical failure
  • Roadside strike
Complete post-trip inspection
  • Hidden vehicle damage
  • Hot components
  • Vehicle roll-away
  • Unauthorised use
  • Trip hazards

Need to add specific site requirements?

Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.

Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

Legislation & References

The template includes references relevant to the documented work, including:

  • Work Health and Safety Act 2011 (or corresponding state/territory WHS Act): ss 19, 28 and 47-49 — primary duty of care, worker duties and consultation.
  • Work Health and Safety Regulations 2011 (or corresponding state/territory WHS Regulations): rr 34-38 — identification, control, maintenance and review of risks.
  • Work Health and Safety Regulations 2011 (or corresponding state/territory WHS Regulations): rr 203-213 — management, proper use, warning devices, maintenance and inspection of plant.
  • Work Health and Safety Regulations 2011 (or corresponding state/territory WHS Regulations): r 299 — SWMS requirement where vehicle movement forms high risk construction work.
  • Safe Work Australia, Managing the Risks of Plant in the Workplace Code of Practice — safe plant, operator information, inspection, maintenance and defect management.
  • Safe Work Australia, Moving Plant on Construction Sites Code of Practice — vehicle-management planning, separation of pedestrians and mobile plant, and SWMS controls.

Standard SWMS Features (Click to Expand)
  • Task-specific job steps, hazards and control measures
  • Initial and residual risk ratings
  • Assigned responsible persons for each job step
  • Plant, equipment and PPE requirements where applicable
  • Permits, qualifications and high-risk construction work details where applicable
  • Worker consultation, sign-off and review sections

Suitable for Industries

Building and ConstructionTransport and LogisticsWarehousing and DistributionCivil Construction and EarthworksAutomotive and MechanicalMining and Resources

Related templates

$79.50

$96.80

Save $17.30

Free branding + 2 years of updates