Playground Installation SWMS

Product Overview

This Safe Work Method Statement (SWMS) for Playground Installation is designed to identify hazards, assess risks, and implement effective controls for the installation, maintenance, and removal of playground and sport-play equipment. It is a comprehensive document that supports WHS compliance across multiple aspects of playground construction, inspection, and ongoing safety management.

Activities & Specific Tasks Covered

This document includes specific risk controls for:

  • Installation of aquatic play equipment, including water features, splash pads, and associated services
  • Construction of treehouses and elevated play structures, including platforms, ladders, and access ways
  • Dismantling and removal of existing play equipment, including safe handling, isolation, and disposal
  • Ensuring playground safety through hazard identification, risk assessment, and implementation of control measures
  • Evaluation of children’s play areas for compliance with relevant Australian Standards and local council requirements
  • Routine and reactive maintenance of playground equipment, including tightening, repairs, and component replacement
  • Play area maintenance, including cleaning, vegetation control, and management of slip, trip, and fall hazards
  • Scheduled safety checks and inspections of playground equipment, fixings, and impact-attenuating surfaces
  • Soft fall installation, including preparation of sub-base, placement of loose-fill or rubber surfacing, and compaction
  • Installation and adjustment of sport-playground equipment such as swings, slides, climbing frames, and fitness stations
  • Use of hand and power tools, plant, and equipment associated with playground installation and maintenance
  • Traffic and pedestrian management around active work areas in public parks, schools, and community spaces
  • Manual handling and lifting of structural components, soft fall materials, and prefabricated play modules

Who is this for?

This SWMS is designed for playground installers, landscape contractors, builders, maintenance crews, local councils, schools, and site supervisors responsible for the construction and upkeep of children’s play areas and sport-play facilities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start planning and approvals
  • • Incomplete design information
  • • Undetected underground services
  • • Inadequate traffic separation
  • • Unclear emergency arrangements
  • • Unverified aquatic play water quality
  • • Inadequate tree assessment for treehouses
Site establishment and access
  • • Uncontrolled public access
  • • Vehicle and mobile plant interaction
  • • Uneven or unstable ground
  • • Manual handling strain
  • • UV radiation exposure
Underground services and excavation
  • • Contact with buried electrical cables
  • • Gas or water service strike
  • • Excavation collapse
  • • Plant rollover
  • • Flying debris from digging
Foundations and footings
  • • Concrete splash and burns
  • • Incorrect footing dimensions
  • • Trip hazards from open footings
  • • Manual handling of reinforcement
  • • Vibration from compaction equipment
Structural assembly ground level
  • • Crush injuries from components
  • • Pinch points during alignment
  • • Incorrect bolt tension
  • • Use of damaged components
  • • Unstable partially built structures
Working at heights and treehouses
  • • Falls from ladders or platforms
  • • Falling objects from height
  • • Tree branch failure
  • • Improper use of EWP
  • • Inadequate edge protection
Aquatic play equipment installation
  • • Water ingress to electrical systems
  • • Slip hazards on wet surfaces
  • • Unhygienic recirculated water
  • • Chemical exposure from treatment systems
  • • Uncontrolled water pressure
Installation of sport-playground equipment
  • • Impact from moving components
  • • Entrapment in moving parts
  • • Incorrect anchoring of posts
  • • Ball rebound into workers
  • • Use of power tools
Soft fall and ground surfacing
  • • Dust inhalation from materials
  • • Incorrect fall attenuation
  • • Trip hazards from uneven surfaces
  • • Heat stress during laying
  • • Exposure to adhesives or binders
Commissioning and safety checks
  • • Unidentified entrapment points
  • • Inadequate guardrails or barriers
  • • Non-compliant impact areas
  • • Sharp edges and protrusions
  • • Unlabelled emergency stops for aquatic play
Dismantling and removal of equipment
  • • Structural collapse during dismantling
  • • Falling components
  • • Hidden tension in cables and springs
  • • Noise and vibration from cutting
  • • Exposure to legacy materials
Routine maintenance and repairs
  • • Unexpected equipment movement
  • • Contact with energised parts
  • • Working at heights for inspection
  • • Exposure to contaminated soft fall
  • • Use of hand and power tools
Ongoing safety inspections and play area evaluation
  • • Undetected progressive wear
  • • Loose or missing fasteners
  • • Vandalism damage
  • • Encroaching vegetation
  • • Inadequate supervision information
Housekeeping and site demobilisation
  • • Residual trip hazards
  • • Leftover construction materials
  • • Exposure to sharp offcuts
  • • Vehicle movements during pack-up
  • • Public entry during demobilisation

Need to add specific site requirements?

Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.

Legislation & References

This document was researched and developed to align with:

  • Managing the Risk of Falls at Workplaces Code of Practice: Guidance on preventing falls during construction of elevated play structures and treehouses
  • Managing Risks of Plant in the Workplace Code of Practice: Safe use of tools, machinery, and equipment during installation and maintenance
  • Hazardous Manual Tasks Code of Practice: Controls for lifting, carrying, and handling playground components and soft fall materials
  • Managing the Work Environment and Facilities Code of Practice: Requirements for safe public work areas, amenities, and site access
  • AS 4685 (Playground Equipment and Surfacing series): Design, installation, inspection, maintenance, and operation of playground equipment
  • AS/NZS 4422 Playground surfacing – Specifications, requirements and test method: Impact-attenuating surfacing requirements for soft fall areas
  • AS 1170 Structural design actions (relevant parts): Structural integrity and load considerations for fixed play structures
  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017

Standard SWMS Features (Click to Expand)
  • Operational guidelines, with a step-by-step approach to safe work
  • Possible hazards that may be encountered
  • Step-by-step safety procedures to follow
  • Before work starts – Guidelines and Checks
  • Safety measures and guides
  • Operational Safety Checks
  • Before and After Risk Ratings
  • Risk Assessment Matrix
  • High Risk Work Involved
  • Emergency Evacuation Procedure
  • Plant and Equipment
  • Qualifications and Permits
  • Specific Personal Protective Equipment (PPE)
  • Company Personnel Sign-off form