
Vibration Safety SWMS
- -100% Compliant with Australian WHS Acts & Regulations
- -Fully Editable MS Word & PDF Formats Included
- -Pre-filled Content - Ready to Deploy Immediately
- -Customisable - Easily Add Your Logo & Site Details
- -Includes 2 Years of Free Compliance Updates
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Product Overview
This SWMS covers planning, selecting, inspecting and operating tools or plant that create hand-arm or whole-body vibration. It supports planning and risk management for exposure, work methods, operator technique, maintenance, monitoring and shutdown.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan work to identify vibration sources, exposure and combined noise risks
- Set up work areas to manage nearby workers, footing and access
- Select tools, plant and attachments suited to the task
- Inspect equipment, mounts, tooling and electrical condition before use
- Brief operators on grip, posture, cold conditions and task suitability
- Operate hand tools while managing vibration, noise, particles and control
- Operate mobile plant while managing whole-body vibration and rough travel
- Monitor vibration exposure and record trigger times
- Manage cumulative exposure, repeated tasks, fatigue and symptom reporting
- Maintain and isolate equipment while managing servicing and unexpected start-up
- Review health-surveillance information and follow up reported symptoms
- Shut down, clean up and secure defective tools
Who is this for?
Suitable for contractors, workers, supervisors and businesses using or supervising tools and plant that generate vibration.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Pre-start planning |
|
| Work area setup |
|
| Tool and plant selection |
|
| Pre-start inspection |
|
| Operator briefing and fit |
|
| Operate hand tools |
|
| Operate mobile plant |
|
| Monitor exposure levels |
|
| Manage cumulative exposure |
|
| Maintenance and isolation |
|
| Health surveillance review |
|
| Shutdown and clean-up |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Work Health and Safety Act 2011 (Cth model), ss 19, 28, 46
- Work Health and Safety Regulations 2011, Part 3.1 Managing risks to health and safety
- Work Health and Safety Regulations 2011, s 36 Hierarchy of control measures
- Work Health and Safety Regulations 2011, s 39 Provision of information, training and instruction
- Work Health and Safety Regulations 2011, Part 4.2 Hazardous manual tasks, including s 60
- Work Health and Safety Regulations 2011, Chapter 5 Plant and structures
- Code of Practice: How to Manage Work Health and Safety Risks
- Code of Practice: Hazardous Manual Tasks
- Code of Practice: Managing Noise and Preventing Hearing Loss at Work
- AS ISO 5349.1-2013 Mechanical vibration — Measurement and evaluation of human exposure to hand-transmitted vibration
- AS 2670.1:2001 Evaluation of human exposure to whole-body vibration — General requirements
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
$79.50
$96.80