BlueSafe
General Kitchen Safety Knife Handling and Hygiene SWMS

General Kitchen Safety Knife Handling and Hygiene SWMS

  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content – Ready to Deploy Immediately
  • Customisable – Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

General Kitchen Safety Knife Handling and Hygiene SWMS

Product Overview

This General Kitchen Safety Knife Handling and Hygiene SWMS is a site-ready Safe Work Method Statement designed to identify hazards and implement controls for safe food preparation and kitchen operations. It is a comprehensive document that covers multiple aspects of kitchen safety, knife handling, and hygiene to support ongoing WHS compliance in commercial and high-volume food environments.

Activities & Specific Tasks Covered

This document includes specific risk controls for:

  • Safe chopping and slicing of ingredients to minimise laceration and puncture injuries
  • Cutting fresh produce safely, including correct hand positioning and use of cutting boards
  • Cutting vegetables and fruits using appropriate knives and controlled cutting techniques
  • Grating foods with safe body positioning, guarding, and use of cut-resistant gloves where required
  • Handling sharp kitchen tools such as chef’s knives, cleavers, mandolins, and peelers
  • Cleaning of large cooking utensils, pots, pans, and trays while controlling manual handling and cut risks
  • General kitchen safety, including traffic flow, slips, trips and falls, and hot surface awareness
  • Opening and closing commercial freezers safely, including entrapment, ice build-up, and temperature control risks
  • Opening canned goods safely using approved can openers and managing sharp edges and waste
  • Preparing food in high-volume kitchens, including workflow planning and congestion risk controls
  • Safe storage of cooking tools and utensils to prevent falling objects and accidental contact with sharp edges
  • Hygienic handling of food-contact equipment to prevent cross-contamination and food-borne illness
  • Use of personal protective equipment (PPE) such as cut-resistant gloves, aprons, and non-slip footwear
  • Cleaning, sanitising, and maintaining knives and cutting equipment in line with food safety requirements
  • Emergency response procedures for cuts, slips, burns, and exposure to biological contaminants

Who is this for?

This SWMS is designed for commercial kitchen staff, chefs, catering teams, food processing workers, hospitality businesses, and site supervisors responsible for safe food preparation and kitchen operations.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre-start kitchen preparation
  • • Cluttered benchtops
  • • Wet or greasy floors
  • • Blocked emergency exits
  • • Inadequate lighting
  • • Unlabelled chemical sprays
Selecting and inspecting knives
  • • Damaged knife blades
  • • Loose knife handles
  • • Improvised cutting tools
  • • Incorrect knife selection
Setting up safe cutting area
  • • Unstable cutting boards
  • • Restricted work space
  • • Cross-contamination surfaces
  • • Electrical cords near wet areas
Chopping and slicing ingredients
  • • Contact with moving knife blade
  • • Slipping food items
  • • Excessive cutting force
  • • Distraction during cutting
Cutting vegetables and fruits
  • • Juice causing slippery surfaces
  • • Hard or awkward produce
  • • Seed or stone impact
  • • Knife deflection on cores
Cutting fresh produce safely
  • • Biological contamination
  • • Allergen cross-contact
  • • Contaminated cutting tools
  • • Improper food temperatures
Using graters and sharp tools
  • • Contact with grater teeth
  • • Unstable grater position
  • • Small food remnants
  • • Improper use of mandolins
Opening canned and packaged goods
  • • Sharp can lids
  • • Defective can openers
  • • Pressurised contents
  • • Improvised opening methods
Handling and storing sharp tools
  • • Unprotected knife blades
  • • Knives left in sinks
  • • Improper knife storage
  • • Access by unauthorised persons
Cleaning large utensils and knives
  • • Contact with sharp edges
  • • Hidden utensils in sinks
  • • Hot water exposure
  • • Chemical sanitiser contact
Operating commercial fridge and freezer
  • • Door impact injuries
  • • Cold burns to skin
  • • Slips from condensation
  • • Obstructed escape routes
Working in high-volume service
  • • Rushed knife handling
  • • Crowded workstations
  • • Poor communication
  • • Fatigue-related errors
Safe storage of tools and utensils
  • • Improper utensil placement
  • • Falling items from shelves
  • • Blocked storage access
  • • Biological contamination on tools
Incident response and first aid
  • • Uncontrolled bleeding
  • • Infection of cuts
  • • Inadequate incident reporting
  • • Contaminated food products

Need to add specific site requirements?

Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.

Legislation & References

This document was researched and developed to align with:

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017
  • Safe Work Australia – Managing the Work Environment and Facilities Code of Practice: Guidance on safe layout, amenities, and conditions in kitchen work areas
  • Safe Work Australia – Hazardous Manual Tasks Code of Practice: Controls for lifting, carrying, and repetitive movements when handling large utensils and food items
  • Safe Work Australia – How to Manage Work Health and Safety Risks Code of Practice: Framework for identifying, assessing, and controlling kitchen-related risks
  • Safe Work Australia – First Aid in the Workplace Code of Practice: Requirements for first aid facilities and response to cuts, burns, and other kitchen injuries
  • Food Standards Australia New Zealand (FSANZ) – Food Standards Code: Legal requirements for food safety, hygiene, and contamination control in food businesses

Standard SWMS Features (Click to Expand)
  • Operational guidelines, with a step-by-step approach to safe work
  • Possible hazards that may be encountered
  • Step-by-step safety procedures to follow
  • Before work starts – Guidelines and Checks
  • Safety measures and guides
  • Operational Safety Checks
  • Before and After Risk Ratings
  • Risk Assessment Matrix
  • High Risk Work Involved
  • Emergency Evacuation Procedure
  • Plant and Equipment
  • Qualifications and Permits
  • Specific Personal Protective Equipment (PPE)
  • Company Personnel Sign-off form

$96.8

Safe Work Australia Aligned