BlueSafe
Livestock Handling Shearing and Animal Husbandry SWMS

Livestock Handling Shearing and Animal Husbandry SWMS

  • 100% Compliant with Australian WHS Acts & Regulations
  • Fully Editable MS Word & PDF Formats Included
  • Pre-filled Content – Ready to Deploy Immediately
  • Customisable – Easily Add Your Logo & Site Details
  • Includes 2 Years of Free Compliance Updates

Livestock Handling Shearing and Animal Husbandry SWMS

Product Overview

This Safe Work Method Statement (SWMS) sets out the critical steps, hazards, and control measures for safe livestock handling, shearing, and animal husbandry activities on Australian farms and agricultural sites. It is a comprehensive, ready-to-use document that integrates multiple livestock and farm-vehicle operations to support strong WHS compliance and consistent risk management across your property or workplace.

Activities & Specific Tasks Covered

This document includes specific risk controls for:

  • Safe cattle herding techniques, including movement through paddocks, laneways, and yards to minimise stress and aggression
  • Management of dairy operations, including milking routines, cow flow, and hygiene practices in milking sheds
  • Feeding livestock using manual and mechanical methods, including safe handling of hay, grain, and supplements
  • Foot handling with livestock, including safe restraint, inspection, and treatment of hooves and legs
  • General handling of farm animals, including cattle, sheep, goats, and pigs, with emphasis on low-stress stock handling
  • Operation and guarding of mechanical animal feeding equipment such as augers, mixers, and conveyors
  • Milking cows, including set-up, attachment, removal of cups, and managing kick and crush risks
  • Use of motorbikes for mustering, including speed management, terrain assessment, and rider PPE requirements
  • Use of side-by-side buggies in agricultural and commercial environments, including passenger safety and rollover prevention
  • Poultry operations, including catching, handling, feeding, and shed entry/exit hygiene controls
  • Sheep shearing activities, including penning-up, catching, dragging, shearing, and release of sheep
  • Removing hides or fleece, including knife use, manual handling, and biological hazard controls
  • Slaughtering livestock, including animal restraint, humane killing methods, and contamination controls
  • Stockyard operations, including drafting, loading, unloading, and safe use of gates, races, and crushes
  • Unloading deliveries of animal feed, including interaction with trucks, forklifts, and safe stacking of feed

Who is this for?

This SWMS is designed for livestock producers, dairy and poultry operators, shearers, meat and abattoir workers, farm managers, contractors, and site supervisors responsible for livestock handling and animal husbandry activities.

Specific Job Steps & Hazards Covered

Job Step / Activity Potential Hazards
Pre‑start planning and site assessment
  • • Unidentified ground hazards
  • • Unsegregated vehicle and livestock areas
  • • Inadequate emergency access
  • • Untrained or fatigued workers
  • • Extreme weather exposure
Stockyard and race preparation
  • • Damaged yard structures
  • • Uncontrolled animal egress
  • • Slip and trip hazards
  • • Manual handling strain
  • • Pinch points in gates and latches
Handling and moving livestock on foot
  • • Animal kicks and crushing
  • • Aggressive or stressed animals
  • • Being knocked down or trampled
  • • Dog bites or trips
  • • Noise and dust exposure
Cattle herding and motorbike mustering
  • • Motorbike rollover
  • • Collision with livestock
  • • Unstable or uneven terrain
  • • Fatigue during mustering
  • • Remote work isolation
Side by side buggy operations
  • • Vehicle rollover
  • • Loss of control on slopes
  • • Load instability
  • • Struck by moving vehicle
  • • Entanglement with moving parts
Feeding livestock and mechanical feeding
  • • Contact with moving augers
  • • Grain dust inhalation
  • • Feed bin collapse
  • • Crushing by animals at feed areas
  • • Manual handling of feed bags
Dairy and milking cow operations
  • • Kicks during milking
  • • Crushing in milking bales
  • • Exposure to chemicals and sanitisers
  • • Electric shock from milking plant
  • • Slips in wet dairy
Sheep shearing and using shearers
  • • Lacerations from shearing handpieces
  • • Musculoskeletal strain
  • • Electrical faults in shearing plant
  • • Animal kicks during shearing
  • • Noise exposure in shearing shed
Foot handling and routine animal husbandry
  • • Crushing injuries to hands and feet
  • • Needlestick or blade injuries
  • • Zoonotic disease exposure
  • • Animal escape from crush or bail
  • • Chemical exposure from treatments
Poultry operations and handling birds
  • • Dust and dander inhalation
  • • Ammonia exposure
  • • Manual handling of crates
  • • Aggressive roosters or pecking
  • • Biosecurity breaches
Removing hides, fleece and slaughtering livestock
  • • Cuts from knives and blades
  • • Exposure to blood and body fluids
  • • Slips on wet floors
  • • Struck by carcass movement
  • • Zoonotic infection risk
Unloading deliveries of animal feed
  • • Struck by moving trucks
  • • Falling from truck or loader
  • • Load shift or collapse
  • • Entanglement with lifting plant
  • • Dust inhalation during unloading
Stockyard operations and loading livestock
  • • Crushing at gates and ramps
  • • Falls from loading ramps
  • • Vehicle and livestock interaction
  • • Overcrowding in yards
  • • Noise and agitation of stock
General PPE, hygiene and emergency response
  • • Inadequate personal protection
  • • Cross contamination and infection
  • • Delayed emergency response
  • • Heat stress and dehydration
  • • Psychological stress from animal work

Need to add specific site requirements?

Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.

Legislation & References

This document was researched and developed to align with:

  • Model Code of Practice: Managing Risks of Plant in the Workplace – for safe use of motorbikes, side-by-sides, and mechanical feeding equipment
  • Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace – where chemicals are used for animal treatments, cleaning, or disinfection
  • Model Code of Practice: How to Manage Work Health and Safety Risks – for systematic identification, assessment, and control of farm-related hazards
  • Model Code of Practice: Managing the Work Environment and Facilities – for farm sheds, dairies, shearing sheds, and stockyard facilities
  • Model Code of Practice: Hazardous Manual Tasks – for lifting, restraining animals, handling feed, and shearing-related manual handling
  • AS/NZS 3012: Electrical installations – Construction and demolition sites – referenced for safe use of electrical equipment and leads in dairies and shearing sheds
  • AS/NZS 2210: Safety, protective and occupational footwear – for appropriate protective footwear in livestock and yard environments
  • AS/NZS 1337: Personal eye protection – for eye protection during shearing, slaughtering, and mechanical feeding operations
  • AS/NZS 1801: Occupational protective helmets – for head protection in yards and when operating motorbikes and side-by-side vehicles, where applicable
  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2017

Standard SWMS Features (Click to Expand)
  • Operational guidelines, with a step-by-step approach to safe work
  • Possible hazards that may be encountered
  • Step-by-step safety procedures to follow
  • Before work starts – Guidelines and Checks
  • Safety measures and guides
  • Operational Safety Checks
  • Before and After Risk Ratings
  • Risk Assessment Matrix
  • High Risk Work Involved
  • Emergency Evacuation Procedure
  • Plant and Equipment
  • Qualifications and Permits
  • Specific Personal Protective Equipment (PPE)
  • Company Personnel Sign-off form

$96.8

Safe Work Australia Aligned